Nevada City

Planning Commission

Thursday, September 17, 2026

Planning Commission meeting, 1:30 PM. Agenda (277 KB) · Packet (48 MB) · Video (3:12:01)

Not yet checked. A language model drafted the items, outcomes and video times on this page from the agenda and the captions. Nobody has checked them against the video yet.

Present: Rodney Brown, chair; Amy Cobden, vice chair; Lindsay French; Thomas Nigh; Meshawn Simmons.

Consent items

  1. 1
    Minutes of the August 20, 2026, Planning Commission meeting
    Minutes approved (Consent calendar, voice vote) · Video at 0:04:12
  2. 2
    August-September 2026 liaison report
    Report received (Consent calendar, voice vote. The report says construction appears to have begun at 211 and 215 South Pine Street without a building permit, and that staff is investigating) · Video at 0:04:12
  3. 3
    August 2026 building activity reports
    Report received (Consent calendar, voice vote) · Video at 0:04:12

Architectural review and sign permits

  1. 4
    111 North Pine Street: Two double-sided metal signs for Waterhouse and Sherwood, replacing the Friar Tuck's signs in the Historical District
    Sign permit approved (5-0) · Video at 0:04:57
  2. 5
    416 Broad Street: Double-sided blade sign for a Sotheby's International Realty office in the Historical District
    Sign permit approved with conditions (5-0. The commission added one-inch rounded corners and a white border half an inch wide, set half an inch in; the applicant is to send the planner a revised drawing) · Video at 0:14:01
  3. 6
    218 Drummond Street: Demolition of a detached garage and part of a 1960 house, with an addition and a new attached garage
    Architectural review continued (Voice vote, to a date to be determined, pending a revised design; the commission agreed to an advisory review with two commissioners first) · Video at 0:28:25

Public hearings

  1. 7
    223 ½ Broad Street: Variance and amended architectural review for a new entry vestibule at the Odd Fellows Hall in the Historical District
    Variance approved with conditions (4-0, Vice Chair Cobden recused. The carved scrollwork on the doors is to be replaced with a longer panel. The hearing resumed at 1:46:04 after a break) · Video at 1:38:13
  2. 8
    545 and 555 Searls Avenue: Tentative parcel map dividing a developed 2.29-acre light industrial property into two parcels
    Parcel map approved (5-0) · Video at 2:45:21
  3. 9
    Model Water Efficiency Landscape Ordinance, replacing the city's landscaping rules to meet a state mandate
    Ordinance recommended (5-0, recommending that the City Council adopt the ordinance. The staff report says the state sent the city a Notice of Violation on August 6, giving it 90 days to adopt a compliant ordinance) · Video at 2:52:36

Informational items and ongoing project updates

  1. A
    Draft Housing Element update expected in October
    Update received (A second community workshop has been held; results of the first workshop and survey are available from staff) · Video at 3:10:26
  2. B
    New lighting ordinance to be drafted, timing to be determined
    Ordinance received · Video at 3:10:26
  3. C
    Signage ordinance updates on window decals and A-frame signs, timing to be determined
    Ordinance received · Video at 3:10:26

Transcript

These are YouTube's automatic captions. They mishear names and words, and they do not say who is speaking. Each time links to that moment in the video.

0:03:00 hereby call this meeting of the Nevada City Planning Commission to order. Please join me in the well actually first almost forgot. Uh we acknowledge that the Nissan people are still here among us today though nearly invisible. We understand that we are on Nissan land that was never seated and the original tribal families have yet to recover from the near genocide of their people. As a resident or visitor in the Nissan land, we support the Nevada City Rancher and Nissan tribe in efforts to stabilize their people as well as their campaign to restore federal recognition. Now, please join me in the salute to the flag. I pledge allegiance to the flag of the United States of America and to the republic for which it stands, one nation under God, indivisible, with liberty and justice for all.

0:03:51 >> Roll call, please.

0:03:53 >> Commissioner Simmons

0:03:54 >> here.

0:03:55 >> Commissioner Nye

0:03:56 >> here.

0:03:57 >> Commissioner French here.

0:03:58 >> Vice Chair Club,

0:04:00 >> present.

0:04:02 >> Uh, Chair Brown

0:04:03 >> here. Great. Any corrections to the agenda or any modifications? No.

0:04:09 >> None.

0:04:10 >> Okay.

0:04:12 >> Now, open up the floor to public comment for anyone who has comment on items not on the agenda. We will hear comments on items that are on the agenda uh when those items are heard. Is there anyone who would like to comment on an item not on the agenda? Seeing no one, I will move on to the consent calendar. Is there anyone who would like to comment on or pull an item from the consent calendar? The public may comment as well if they have any comments on that. Seeing no one, uh would someone like to make a motion to accept the consent calendar?

0:04:51 >> I move to approve the consent calendar.

0:04:53 >> All right, we have a motion in a second. All in favor, please say I.

0:04:57 >> I. Anyone opposed? No one. The consent calendar is approved. Okay, moving on to the first item, which is uh 111 North Pine Street uh historical district sign permit application. Hand it over to our planner. If the applicant is here, please come forward.

0:05:19 >> Is this Oh,

0:05:22 >> wait. Did I jump?

0:05:22 >> Do I need to recuse myself? No. Oh, this. Never mind.

0:05:27 >> All right. Yeah. Have a seat. Thank you.

0:05:29 >> Okay. Thank you, Chair Brown. commissioners. Uh Jessica Henin, city planner. All right. So, um this is a historical district sign application for the property located

0:05:42 >> actually. Excuse me. The

0:05:43 >> Can you not see it?

0:05:44 >> You can't see it up there.

0:05:46 >> Oh, we can find out what's happening to it. Okay.

0:05:51 >> All right.

0:05:52 >> We'll check that television set.

0:05:53 >> Oh, you can continue, I think, in the meantime.

0:05:55 >> Is it okay? Okay. Um so this project is in the current location of Frier Tux um at 111 North Pine and um this building is listed as a contributing building on the National Register of Historic Places. Um it was mostly destroyed in a fire in 2002 after which it was rebuilt. Um the applicant is proposing for this project to replace the two previous Frier Tux signs um that were located outside the building with two new signs of the same size and similar design with new business names. Um one of the business names is Waterhouse Events and Fine Dining and the other is Sherwood Restaurant and Tavern.

0:06:37 Uh the signs would be located exactly where the previous Frier Tuck signs were located. This is a an image of where the previous signs were and where the new signs would go. Um, just for reference, this is the Frier Tuck sign that was approved by planning commission in October of 2025, so not too long ago. These are the new proposed signs. Uh, the sign material is Dbond aluminum. Sign colors are all within the Benjamin Moore historical collection palette. Um [clears throat] the signs are double-sided and the sign area combined total u for with both double-sided signs is 18 square ft. Um the lettering on these signs is um similar to older serif like decorative serif fonts that are consistent um with other lettering in the historical district.

0:07:34 Uh the same fixtures would be used on these signs. Um, I think I'll skip ahead here. So, on the on the um the graphics of this sign, they're they're pretty simple graphics. I'll scroll back up so you can see these again. Um, we just have an outline and some simple graphics on both of these signs. The Sherwood sign has sort of an illusion to Sherwood Forest. Um there the colors again are consistent with our design guidelines um with the Benjamin Moore historical collection. The sign material um our sign guidelines don't comment on sign material other than to say most of the signs in the historical district are wood or some of them are carved wood.

0:08:18 Um but metal signs have been approved in the historical district on numerous occasions including at the current location less than a year ago. The sign fonts are consistent with those found in the motherload era and the signs meet all of the other sign standards for the historical district including sign size. So staff is recommending that the planning commission find the project exempt from squa under minor alteration of existing facilities and approve the historical district sign application making the finding shown in the staff report and subject to the conditions of approval shown in the staff report. Great.

0:08:50 >> That concludes my presentation.

0:08:52 >> Thank you. Anything you'd like to add? No, we're we're uh excited u and with the opportunity to u take a historic restaurant and continue with the same what we're doing now and opening to what I believe a community would like to have a more open space more opportunity to get together and taking the wall down is a big deal because we're taking the wall down to enjoy life together. So, we think a name change is kind of dramatic, but yet it also causes a re-uping to build community. So, that that's our goal and our intention.

0:09:38 And so far, with 40% increase of people coming in, I think they're kind of interested. So, I love the opportunity.

0:09:47 >> Great. Thank you.

0:09:49 >> Bring it to the commission now. Any questions from anyone on the commission?

0:09:55 >> Um, I have a question. Uh, so they're separate businesses.

0:09:59 >> No, it it's it's the same. What we wanted to do was uh have a place that is u more um uh wedding driven uh event driven. So, we distinguished the room uh soundproof room that Gary Tinto built uh so that if you wanted a quiet event uh like tonight is a special dinner event, soundproof doors, but it's the same ownership on both.

0:10:29 >> Okay. Uh because we allow one one side per street entrance of a business or I think I think the two signs in your in your current location in the same name uh work fine. But but I'm just curious if it's a separate uh entity that the second ver the second sign is assigned to. Um perhaps I'm missing something. It looks great. I'm just these are

0:11:03 >> questions that uh about the businesses to which the two different names are assigned

0:11:09 >> and and if that affects the sign approval at all.

0:11:13 >> Does that make sense?

0:11:14 >> But you're saying it's the same business.

0:11:16 >> Yeah. It it it says event and fine dining

0:11:20 >> at the Sherwood.

0:11:23 >> So

0:11:23 >> no it says event and fine dining at the Waterhouse. Yeah. Yeah.

0:11:28 >> And the other sign says Sherwood,

0:11:29 >> right? But it but at the the arrow says at the Sherwood. So, I mean,

0:11:34 >> is there an arrow that you'll include in this?

0:11:36 >> What's that?

0:11:37 >> Is there an arrow that you'll

0:11:38 >> Yeah, there's an arrow on the door. Yeah. I mean, it's not on the sign, it's on the window. Yeah.

0:11:46 >> Um, so the I can maybe speak to this. So the sign ordinance which I have up here, this is what we would use to approve or deny the project. Um for any individual business, the single the aggregate area of the signs can be up to 24 square ft. So if this is registered as one business with one business license and one business name that either way it it will comply with the sign standards actually. And if it's two separate businesses, it would get more signage potentially. Um, so

0:12:22 >> yeah, the DBA,

0:12:23 >> I don't think they're asking for that though.

0:12:24 >> The DBA is under Tux Corporation for both names at registered under Frier Tux with the DBA with two names.

0:12:36 >> Okay, that clarifies my question. Thanks.

0:12:39 >> Any other questions? [sighs] No. If none, is there anyone in the public who would like to comment on this item? Seeing no one, uh, come back to the commission for discussion. Is there any discussion on this item?

0:12:56 >> I'll just say looks fine.

0:13:00 >> I'll say that, too.

0:13:02 >> Okay. All right. Um, I will I'll go ahead and make a motion then uh to approve the project uh determining that that it is exempt from SQA and approving the sign application with the conditions of approval as listed in uh the agenda item.

0:13:25 >> Is there a second?

0:13:26 >> I'll second.

0:13:27 >> Motion to second. Roll call, please.

0:13:30 >> Uh, Commissioner Stemon,

0:13:31 >> yes. Commissioner Nye,

0:13:33 >> yes.

0:13:34 >> Commissioner French,

0:13:35 >> yes.

0:13:35 >> Vice Chair Copton,

0:13:36 >> yes.

0:13:37 >> Chair Brown,

0:13:38 >> yes.

0:13:39 >> Approved. All right. Thank you and good luck.

0:13:42 >> Come enjoy a glass of wine at the waterhouse on me.

0:13:45 >> All right. Glad to hear it's doing well, too. [laughter]

0:13:54 >> Are we allowed to accept the line? Well,

0:13:57 >> as long as it's under some [laughter] under some some

0:14:01 >> moving on to the next item. Uh 416 Broad Street Historical District sign application. And the applicant for that is here. Please come forward.

0:14:12 >> Yes.

0:14:17 >> Great. Welcome. All right, Jessica.

0:14:21 >> Okay. Um so this is a historical district sign application for Sabes. Um, this subject property is on Broad Street near the top of Broad Street at a property that is listed again in the National Register of Historic Places, but which also burned at uh some point and was rebuilt um in I think it was in 2021 and it [clears throat] was rebuilt to mostly its original form and that was all approved by the planning commission. I do want to make a note before we head into the signed permit um that this this use as an office for a real estate office um we do have provisions in our general business district code that says that you can't have an office on the ground floor unless you have a conditional use permit.

0:15:10 Um there have been offices in this location according to the property owner Ken Baker for more than 50 years. So all of that historical information is listed in the staff report. Um and it's a continuing legal non-conforming use. Um this is a these are some photos. There's a historic photo on the left and an existing photo on the right. The project proposal is for a double-sided blade sign um which is vinyl over half inch MDO substrate. Um the background uses a historical collection color hail navy blue with white lettering and it this is the you know the brand lettering for South International realy um that's a what's called mercury serif type face and then there's a suns serif type face for the realtor um and the international realy that's consistent with the branding um on this um there um I I would state here and this is something that wasn't in the staff report, but without um any edging on the sign, this could be considered quite modern.

0:16:28 And so um staff would recommend the commission consider adding just a line around the outside edge. Um, and that would be consistent with some of the other signage that's around the historical district. A lot of it does have the edging. Um, and I did an inventory of some of the signs around town and and those signs that don't have edging, I did notice um are a little bit more modern looking usually. So, we we do have some that don't have edging, just for the record. Um, so this sign again, just like the last sign, the um, it meets all of the sign standards in terms of the square footage.

0:17:07 Um, there's no lighting proposed on it. Um, and then the MDO substrate is a material that the planning commission has approved in the past for other signs in the historical district uh, due to its kind of adjacency to wood. So [clears throat] staff is recommending that the planning commission exempt the project from SQA and approve the sign application or may be modified um at the hearing um potentially with staff's recommendation um finding that the proposed sign meets all of the sign regulations and substantially conforms with the motherload type of architecture with the attached conditions of approval. That concludes my presentation.

0:17:47 >> Great. Thank you. Anything you'd like to add to that?

0:17:51 >> No. Okay, great. Uh, questions from the commission on this item.

0:17:59 >> Question.

0:17:59 >> I I do have a question. Um, I guess it's immaterial to the approval, but is this a second Sabes that's going to be in town now or

0:18:08 >> I don't know. I'm just a sign company.

0:18:11 >> I don't know. Okay. [laughter]

0:18:13 >> I don't know if there's two of them.

0:18:17 >> Other questions? Seeing no questions. Uh is there any Oh yeah. to be framed as a question. Um there's a there's a a uh a concrete planter in front of the the location and u like directly in the in the in the picture directly below the sign placement which is at the center post. Is that correct? The center post of the building.

0:18:46 >> Post the first one. I think that the concrete planter might be on the other side of

0:18:51 >> the first one. The concrete planter's on the other post, the center one.

0:18:54 >> I see.

0:18:58 >> Um Okay. I'm just wondering how that related to the planter and if it would extend uh below the um in to a height that might uh get in the way of people. There's a there's a public walkway between those two buildings.

0:19:17 >> It says seven feet to the ground. That's what it was. I was told it had to be. Says seven feet to grade.

0:19:24 >> Okay. Thank you. Okay. Other questions? Seeing none, is there anyone in the public would like to comment on this item? Seeing no one, uh, come back to Oh, is there one? Oh, yeah. Please come forward. Lee, good uh Seth's international realy. I just wanted to say I'm here if you do have questions about that. We have been uh actually I've been a real estate broker for almost 52 years and started in this building when it was Don Newton realy uh before and after I was there.

0:20:10 I was there in 1974 to 1976. So if you have questions about that part, I think you did. I'm happy to answer them. It is an active real estate office now.

0:20:22 >> Oh, that was not the question. The question was, isn't there is there already another Sabbes that's down the street? Um,

0:20:28 >> no.

0:20:29 >> Okay. No, that's all.

0:20:30 >> Yeah. No, I couldn't quite hear you.

0:20:33 >> Okay, great. Thank you, Lee. Okay. Anyone else in the public? Okay, seeing no one uh discussion from the commission and I'll start uh off by saying uh I agree with uh what staff was saying about the line around the edge uh right now as it stands the sign I mean the the font is acceptable but you know the plain square a square of text within a plain square is a very modern look and I think just adding a border you know a white other is okay with it. I'm okay with it.

0:21:11 >> Okay. Yeah.

0:21:12 >> Uh I don't know.

0:21:14 >> E inch quarter inch eigh inch line all the way around it.

0:21:17 >> Yeah. Maybe just inset by half an inch.

0:21:19 >> Yeah. Something like that I think would be fine. And keep that same uh logo that the company has.

0:21:26 >> That's my point.

0:21:29 >> Yeah, I agree with that. I think that would look better. But you would have to go to the brand, right? Because this is a

0:21:34 >> Yeah. I'm going to have to ask them if they'll let me do it. But

0:21:37 >> they can do it if they want to sign.

0:21:39 >> Yeah. Yeah. [laughter]

0:21:40 >> I think that this has been the case for many big businesses in town that

0:21:44 >> uh there are conditions

0:21:45 >> Yeah.

0:21:46 >> for having businesses downtown.

0:21:49 >> Small price to pay.

0:21:50 >> And I did Google some Sabby's um other logos and signs and there there are some variances. So hopefully allow it.

0:22:00 >> Great. Tom,

0:22:02 >> if if I'm if I'm not incorrect, this is a this is a a franchise of a of a corporate business. It's a formula business, and we we have we have code that pertains specifically to formula businesses in the historic district. Part of that is uh is signage and we've uh we have we have historically um uh asked for aesthetic changes in corporate signage partly because um it it's so recognizable as a as a national international brand uh especially presented like this. It's like obviously this is Saby's branding which takes the aesthetic out of the historic sense of the historic downtown.

0:22:52 Um, and there there are some examples of of the many ways in which uh formula businesses have modified signage for the downtown. Um and uh uh we uh um Jessica do you happen to have

0:23:11 >> Yeah.

0:23:12 >> There are examples in the guidelines like BFA was a classic

0:23:17 >> cult of anchor of banker is another one.

0:23:24 >> That's [clears throat] right. Is do we not get that screen?

0:23:29 >> Is this not working? No, this just

0:23:32 >> Okay.

0:23:34 >> So, before on the left and after on the right. Um because of course formula businesses can serve the community very well. Um and uh but to to uh bring the branding so directly and starkly in is kind of problematic aesthetically. And and I so I I I also I agree that the that the um that being said, I agree that the fonts are are acceptable. They fit they fit within our um you know sign context. Uh but to take it out of the frankly sues branding, I would I would support a a border around the edge and also radiused corners.

0:24:21 um it would soften it quite a bit and um

0:24:25 >> I think

0:24:26 >> uh there was a there's a well no no need to discuss that. Um yeah, so we have the latitude to um to deny the use of corporate branding. Um uh and um so at the at the applicant's uh choice, it it might make sense to um take our suggestions.

0:24:56 >> Um

0:24:57 >> so so I so I I propose radiused corners about a 1 in radius and a and a border which would make it fit in a lot better. As Jessica said, that's something we have a lot in town.

0:25:08 >> And I don't know if the commission would agree with that. The radius the radi as well.

0:25:13 >> I do. When I initially looked at it, it looked really modern to me and I couldn't figure out how it could be altered. And I think both of these suggestions would be

0:25:21 >> the radius corners inverted or outward.

0:25:23 >> Sorry.

0:25:24 >> You want them inverted or out? The radius corners.

0:25:27 >> Oh, e externally. Externally.

0:25:29 >> Externally. Okay.

0:25:32 >> Just to soften it shape somewhat. And then the edging you'd have go around

0:25:38 >> around around the outside edge. It could even be

0:25:41 >> it'd be inside a half an inch all the way around.

0:25:44 >> Yeah, that's exactly what I was going to try to say. [laughter]

0:25:49 >> Yeah, I think that's a good change as well.

0:25:53 >> Okay.

0:25:55 >> Any other discussion from the commission? I I just add if you know the alkan's welcome to come back as well if he finds us unacceptable.

0:26:04 >> They'll probably say yes. I know they want to sign for the answer. [laughter]

0:26:08 >> Okay. Uh would someone like to make a motion then?

0:26:14 >> I'll I'll make a motion to Let's see. Do we begin with u exemption from C

0:26:19 >> exemption? Sorry. What PDF page is that?

0:26:23 >> Uh it's like 18. Uh

0:26:26 >> yeah, 18. Yeah, right at the bottom. 18 beginning of 19. Okay. I make a motion we we find the uh the project exempt from SQA and approve the sign um uh as modified by the following conditions that uh a half inch did I say half inch or one inch radius

0:26:46 >> you said one inch

0:26:47 >> one inch one inch one inch radius on the outside corners um and a a uh a border in white same same color as the

0:26:57 >> as the letter

0:26:58 >> lettering ing uh/ inch in and a half inch wide.

0:27:04 >> Half inch wide.

0:27:06 >> Do you have another suggestion?

0:27:08 >> I'd say a quarter or eighth. Half inch wide is pretty wide.

0:27:13 >> I'm okay with you. It's your motion.

0:27:16 >> Don't matter to me though.

0:27:17 >> I I I I think a half inch wide would say it more clearly.

0:27:21 >> Okay.

0:27:22 >> This has to measure. [laughter] It's pretty pretty small at that at that distance. Um,

0:27:31 >> let's see.

0:27:31 >> Thin lines tend to read more modern, I think, is the concern.

0:27:34 >> Yeah.

0:27:36 >> Thank you. Thank you, Amy. Uh, and making the findings A and B and uh the conditions of approval A through F.

0:27:47 >> Great. We have a motion.

0:27:48 >> I'll second.

0:27:49 >> Motion to second. Roll call, please.

0:27:52 >> Commissioner Simmons.

0:27:53 >> Yes.

0:27:54 >> Commissioner Nye.

0:27:55 >> Yes.

0:27:55 >> Commissioner French. Yes.

0:27:57 >> Vice Chair Copton.

0:27:58 >> Yes.

0:27:58 >> Chair Brow.

0:27:59 >> Yes. Passes.

0:28:01 >> Okay. So, do I need to send another drawing in before or is it per

0:28:05 >> I think if if you It's permitted.

0:28:07 >> I just do what you said.

0:28:08 >> As long as you do what you said, it's permitted. Yeah.

0:28:11 >> And and submit and submit the the uh the image to uh the planner for verification.

0:28:17 >> So, I need to send her one. Okay. It

0:28:19 >> probably be safest to do do that before you make the sign.

0:28:23 >> Okay. Cool.

0:28:24 >> We'll do.

0:28:25 >> Thank you. Okay. Uh, next item is 218 Drummond uh, demolition and architectural review application. The applicants would come forward.

0:28:45 >> Afternoon.

0:28:46 >> Good afternoon.

0:28:47 >> You came prepared. [laughter]

0:28:51 >> [clears throat]

0:28:54 >> Is the owner with you?

0:28:56 >> Yes.

0:28:56 >> Coming right up.

0:28:58 >> Yeah. Feel free to pull up another chair there, too.

0:29:12 >> Great. Welcome.

0:29:15 >> Okay.

0:29:15 >> Okay.

0:29:16 >> Thank you. Um, okay. Okay. [clears throat] So, this project again is an architectural review and demolition permit application for 218 Drummond Street. Um, this photograph shows the existing home and garage. The project site is um within an R2 SP zone um which doesn't have too much bearing on what we're doing today because um it is required actually to have just a single family residence and the SP or site performance combining district does not have any ordinance provisions on this particular property like it does in some other nearby properties. Um the existing home was built in 1960. It's a 1,097 square f foot home and there is a detached 384 square foot garage.

0:30:05 The application is proposing demolition of the garage and um some demolition of the existing home um with essentially removing the roof and then creating a new roof line with an addition um to the east which is where the the garage is currently. Um the project plans calculate total building coverage at about 22.7% of the quarter acre parcel uh which is within our lot coverage limitations. Um so the demolition permit includes again the the garage is being demoed including removal of the slab foundation for the garage um removing [clears throat] the uh house roof framing to accommodate a new vated ceiling and removal of damaged sighting.

0:30:53 Um portions of the existing interior and exterior walls will also be removed because there is a new floor plan on the on the home and some new framing. Um the applicant has indicated that there is extensive rot and damage at this property um and some of the materials are not reusable. This is a site plan um of the property. So you can see right here is the existing residence. the existing garage which would be removed and then the proposed addition would come off of the existing residence. There is an existing like gravel driveway um where this is shown but the driveway would be improved um as well.

0:31:38 Uh the applicant has indicated that there is not enough um earthwork that would require a grading permit for this property because it does as you can see from the contours on here it does slope down to the east. Um, so it essentially would be accommodating the same single level residence that's there right now and then as the property slopes down would become two stories um with some excavation but not enough to require grade a grading permit. Grading permits are triggered at 50 cubic yards of earthwork. So, [clears throat] the project includes a 912 ft addition of living area and a new 576q ft attached garage.

0:32:24 And again, the garage is below the the um residential addition um and does not take up additional footprint on the site. The proposed exterior materials are uh rot iron colored Hardy board and batten sighting, 7-in reveal, horizontal Hardy plank sighting, boral 1x4 trim and rot iron color, black aluminum millg guard windows and a rustic rawhide colored standing seam metal roofing. Um the proposed design includes this revised roof form, the vated interior ceiling and this and the sighting that are that's shown in the photos here. Um, and the applicant may have additional information at this point that came in late to me. I do have some additional materials if we need to look at those, but I'm going to if it's I didn't speak to you before the meeting, so if you wanted to present those, we can I think we can do that after I'm done with this presentation.

0:33:22 [clears throat] Um, let's see here. So, the planning commission is required to review proposals for demolition. um demolition of any structures in the city. Um so that is why the commission is hearing this today. The city's architectural review standards indicate that no building of special historical or architectural interest or value or an example of the motherload type of architecture situated inside or outside the historical district shall be torn down, demolished or removed unless the planning commission makes a finding that such building has become so damaged and dilapidated that it can't be reasonably repaired or restored. Um so that is that is a finding for demolition that actually does not apply to this particular site because it does not have historical um interest or and is not a an example of the motherload type of architecture.

0:34:14 So that finding is not required to be made today. The structures on the site were constructed in 1960. They're not examples of the motherload style of architecture. Um and I I already have said that part. Um the submitted plans again do identify though that there is significant rot and decay at the site. Um so staff is recommending approval of the demolition permit. As far as the architectural review goes, um I do want to make a point of of noting that the applicant had actually provided original plans that are not in this application packet or in the staff report with a different um roof line and some different materials.

0:34:56 and um staff had given them some guidance as to what the design guidelines are and to be more consistent with the in Nevada city style of architecture steeper pitched roof lines that have resulted in a higher roof line um than would otherwise have have been proposed um and then there were some substantial revisions made to the design that are now in the staff packet um already. So the proposed materials now which are fiber cement board and batten and horizontal sighting instead of originally proposed it was vertical sighting um with a standing seam metal roof and black aluminum windows. Um these materials are compatible with the city's design guidelines which um do recommend more steeply pitched roofs.

0:35:47 This has an 8 to 12 roof. um do not want to see vinyl windows in the design guidelines or horizont or vertical oriented sighting. So in those respects the project application is um in conformance with the design guidelines. There are some clear story windows that are proposed within the gable ends that aren't typically found in gold rush era structures or some of the smaller residential construction of that era. Um they do appear clear story windows have appeared in architecture for a very very long time um for centuries but typically more in larger institutional buildings and then later you know they've had a more modern revival and kind of mountain chalet style architecture that's found up on the Donner Summit and Tahoe area.

0:36:40 Um, at the time that staff wrote this report, um, I staff had gone and done an inventory of the neighborhood to see if there were any other examples like this. did not see any in the immediate vicinity, but I did go out to the site today and there are there is one home that's just up the street um that I'll I'll show you some pictures of later that's a little bit more along the Tahoe style of architecture that was approved by the commission um and has kind of the darker wood sighting and um more Tahoe style influence on it. So you can see in these photographs in terms of neighborhood consistency or um compatibility which is one of the findings the commission does have to make to approve the project.

0:37:33 There are number of different architectural styles in the neighborhood. Um there are some California ranch and mid-century bungalows, some gold rush era homes. Um some original older homes, Victorian era homes. Um and you can see all of those represented here in these photographs. So staff is recommending um because of these um reasons, staff is recommending approval of both the demolition and architectural review permit and recommending that the planning commission find the project exempt from SQA and approve the demolition permit and architectural review application making the findings shown in the staff report and with the conditions of approval shown in the staff report.

0:38:21 Um, and then before I move on, I do have some additional information. Um, so the city has received a number of public comments on this item. Um, I think believe we received nine or 10 letters um, as of this morning. And so I just wanted to provide some more information based on some of the concerns in those letters. So first I just want to provide information on this is just facts about the project. The existing living area is 1,97 square ft. The proposed living area is an 83% um addition to that number.

0:39:07 The garage is 50% larger. The structural area total when you add the garage and home is 75% bigger. But the footprint of the of the total structure is only 35% bigger because they were able to tuck the garage under the home. Um there are two findings that the commission would need to make to approve this project. One is consistency with the neighborhood and the other is compatibility with the Nevada city style of architecture which is not the same as the motherload style of architecture but a broader category that's not quite defined but can be any of those types of architectural styles that I showed earlier in the staff report and and and other eras as well because there [clears throat] is a lot of Nevada there there's been development over the years there are 1970s homes in the neighborhood as well.

0:40:02 And so there's there's just a lot of variety potentially. Um, but I think we know that the the design guidelines for residential development outside of the historical district are pretty clear that should have steeper pitched roofs, natural materials, um, windows that are more vertically oriented and those types of things which the applicant has made changes to accommodate. Um, I did want to summarize some of the public comments on this and I'm not capturing every comment um at all. Um, but we received several comments on each of these items. The colors are too dark or the materials are too dark. The style is too sort of trucky looking or mountain looking.

0:40:45 It's the building itself is too tall and large. It would block neighboring views and light. um there is a housing element goal to retain smaller houses and the SQA findings aren't clear enough. So those were just some of the the more prominent um comments that I'd be happy to address right now um with the commission's permission if I can go through those. Okay, great.

0:41:14 >> Um so I think I'll start with the ones I've got some information about up here. the SQA findings. Um the SQA finding is on is in SQA guidelines section 15301 for existing facilities and it does have within that particular section there are a number of of ways that you can find an existing facility exempt if you're adding to a building. And one of those is is that it exempts up to 10,000 square ft additions to existing structures if the project is served by public services and utilities and the area is not environmentally sensitive and that is definitely applies to this site. So that is the finding for SQUA.

0:41:57 Um the housing element goal there is a housing element goal that is part of a policy to quote include other opportunities to increase the supply of affordable housing. So that's one of our policies and in our current housing element, not the one that we're in the process of updating right now. The program under that policy is quote, "The planning commission shall review all residential expansion requests in excess of 25% with the goal of retaining smaller housing units while maintaining diversity of the housing supply." And um so it it just says the planning commission will review them and that we do want to try to maintain smaller houses within our housing stock.

0:42:43 Um and I think this this comment probably goes a lot with the two tall and large and and also maybe blocking views and light as well. So, I want to share if my PDF cooperates here, which it may or may not. It likes to do this sometimes. Give me a minute. Um, let me see if I can re Should I close it and reop just a minute here? Okay, it's still

0:43:38 almost there.

0:43:50 Okay. All right. This home is at the corner of American Hill and Lost Hill Court. Um, and you can see that this uses kind of the darker colors as well and does have some elements of that kind of mountain style um, architecture to it. It is not this exactly the same, but it has quite a few windows and some of the elements that you would see up in Truckucky. Um, you can see here just across the street from the home there is a three-story structure and then a couple of doors up there is a structure that is um and I believe I in a different photograph you can actually see that some parts of this structure are three stories um and it has an ADU on the property as well that's one and a half or two stories.

0:44:48 Um, but you can see too, this is the home to the right, the existing home. And, um, right next to it is a small bungalow style house. And then these are the elevations that were or the renderings that were provided with the project application. And I want to make a clarification on the height um because there was one inaccuracy in the elevations that were provided. Um the height on the American hillside elevation is 20 ft um 4 and 3/4 in. And on the um Drummond side it's 29T 2 and 3/4 in.

0:45:36 And at its tallest it is a two twostory home. Um, this particular elevation here to just to note is from the interior sideyard. Um, and then I've have just a a map showing these sizes. Uh, um, and and I don't have heights. It's not possible for me to go measure every home in the neighborhood. But, um, we can see how tall how many stories are at each of these homes. And with assessor's records, I was able to look up square footage of these other homes. So, the home, this is the subject property in red. The proposed square footage is 2009 square ft plus a 570 ft garage underneath.

0:46:19 Um, the homes that are that have the black writing, those are homes that are smaller than the proposed project and in blue are homes that are larger than the proposed project. So, you can see there are a number of homes that are approaching 3,000 square ft uh especially up in this area here and on Drummond. Um but there are kind of smaller homes towards the back of Drummond and coming up American Hill. And that um that is it I think. Oh, let me go back. I'm sorry. That answered a couple of questions but not all of the questions here. So, um, in terms of the colors being too dark, um, I believe that the the intent here was to have more natural looking materials, like wood looking, dark metal looking materials.

0:47:13 Um, and so we do have the, you know, the current home, you saw photos of that, and the a home across the street are both darker. Um, and then there's the home that's at the corner of Lost Hill Court and American Hill, and that is obviously darker because it's wood. So, a lot of our buildings that are wood are darker colored. Um, so, um, that would be my response on that. And with that, I think I'm done with my part of the presentation. I also have some additional items that the applicant sent over this morning. So, I'm happy to throw those up on the screen if you'd like.

0:47:47 >> Yeah. Great. Thank you, Jessica.

0:47:49 >> Yeah.

0:47:50 >> And think we're ready. You're done. Ready for the Yeah. So,

0:47:54 >> please.

0:47:54 >> All right. Um, first I'd like to apologize for the inaccurate dimensions on the um elevations, the south elevation specifically. This is uh not our first rendition of this home. So, we've been working through it and some of the layering got off in the drafting file. All that being said, I apologize for that. I do have a I printed out and updated uh all of the elevations and the site plan here uh to make it easy for you guys to see. Um like she had said, it brings the um gable height to around 20 ft from the American hillside in addition to the house actually being set down from American Hill.

0:48:34 Um it's not, you know, up above it. So it does bring it into kind of the normal of the houses that surround it. Most of the houses are pretty tall around there. Um

0:48:45 >> can you clarify that? I'm I'm a little lost here. Are you saying that what we saw in the packet and maybe I was focusing on something while you said this, Jessica, I apologize. Uh the images that we have in the packet are not representative of how tall the house will be. Is that what you're saying?

0:49:00 >> No, they are. Um those are all to scale, but there was one on the south elevation. There's one um the the dimensions on the south elevation were wrong. Um

0:49:11 >> in what way?

0:49:13 >> Like they were wildly inaccurate. Like the

0:49:16 >> number was wrong. Um,

0:49:17 >> there was a number stated that was incorrect.

0:49:19 >> Okay. But not but not the the perspective.

0:49:22 >> Yes, everything's correct. Just the number on the dimension was was inaccurate. I apologize. Um, okay. Uh, Nevada City's neighborhoods are wonderfully diverse with a mixture of architectural styles, materials, and vintages. Um, that diversity is an important part of what makes Nevada City so distinctive and charming. After walking the surrounding neighborhood and carefully considering the range of existing homes, our goal has been to create a design that is compatible with the neighborhood while not attempting to replicate anyone anyone particular style. This is our at least our second design iteration. Uh with the helpful guidance of Jessica from planning and a thorough review of the Nevada city design criteria, we've made a number of changes intended to better align this project with the character of the neighborhood.

0:50:11 These include an 8 and 12 pitched roof, uh, gable end construction, incorporation of horizontal siding into the overall design, uh, 2 to1 window proportions where practical, and a metal roof. Um, the proposed gable windows are also intended to reference a traditional archite architectural feature that has been used more than a century in Victorian craftsman and folk style homes. We believe this element helps give the home an established architectural character while remaining appropriate to the overall design. Um, as is typical with a remodel of this scope, the precise extent of demolition cannot be determined until portions of the existing structure are opened.

0:50:59 Um, the extent will be guided primarily by structural and existing condition requirements. engineering will likely require balloon framing, shear walls, and uh roof support post and beams at the gable end walls where the ceilings are vated. Um, in those locations, the walls will likely need to be demoed all the way down to the subfloor to accommodate all the new structural framing. Um, additionally, homes constructed in 1960 can sometimes reveal conditions that are not apparent until the walls are opened, including rot, undergared framing, pest and rodent damage, or framing that is outside the modern standards for plum level and energy efficiency. Uh, any such conditions will be addressed as necessary and based on the actual conditions encountered during construction.

0:51:46 Um, in selecting the proposed materials, we've made a deliberate effort to respect the existing character and flow of the neighborhood while also making wildfire safety an important consideration. Uh, the project incorporates will be approved materials like James Hardy sighting, uh, metal roofing and appropriate soft materials. Our intention is to create a home that is not only visually compatible with its surroundings, but also provides a high level of fire resistance and long-term durability. Uh the grade the grading associated with the proposed garage is relatively minimal by typical construction standards. Uh the garage will require excavation and a retaining wall with the final design and specifications to be determined after it goes through engineering.

0:52:31 Uh fortunately existing slope as Jessica mentioned um does slant towards the drum and street access. Um, it's about a 48 inch cut uh at the back of the garage and then it works about to nothing at the front of the garage. Um, finally, we would like to clarify that the renderings included in the submitt were intended solely to assist with architectural review. While I AI generated renderings are extremely useful tool for illustrating proposed sighting, roofing, and paint schemes, they can occa occasionally introduce inconsistency of details. they're not representative of the actual design. To make the proposed design as clear and accurate as possible, we prepared printed renderings in which most of these inconsistencies have been removed.

0:53:20 Thank you very much for your time, consideration, and thoughtful review of our prop proposed remodel. We appreciate the planning department's guidance throughout the process and have made a sincere effort to respond to the design criteria and character of the surrounding neighborhood. Can I show the

0:53:35 >> please

0:53:36 >> update renderings? Okay.

0:53:41 >> So, we tried to eliminate um we tried to incorporate eliminating some of the board and batten because we know that wasn't necessarily some of the um that was a hold up for some of the design criteria. So, um, this is an example of like a rusted corrugated steel of the front door, which you'll see in some of the mother load homes around the area. Um, the renderings that were put into the plans, they showed um like decks and all kinds of stuff that AI just puts in there for whatever reason. So, we eliminated all of that stuff um to create a little bit cleaner look as to what the project will actually look like.

0:54:27 Um the front door access will actually it stays in the exact location that it's at now. Um same same grade level, same everything. Um we'll probably change the walkway up to it because it's a fairly dilapitated uh sidewalk that walks up to it now. Um but that is the general idea. of what we're shooting for. We did eliminate the gable and windows above the garage to try to accommodate some of the letters that were sent in and create a little bit more flow with the surrounding area.

0:55:09 >> Could Could you just echo through those one more time? Yeah.

0:55:13 >> Let me know when you're ready to switch. And while while you're doing this, why did you eliminate the Bordon batten?

0:55:22 >> Um, well, my understanding was that was maybe not as desirable as like a horizontal sighting or a a corrugated tin or something of that nature.

0:55:32 >> Is this something that you

0:55:34 >> No, all of those are acceptable.

0:55:36 >> Let's let them finish, please. Yeah.

0:55:41 >> So, it's AI, so it's it's a little difficult. This side will have work. This side has horizontal and then on the back it'll be the same.

0:55:50 >> Okay.

0:55:52 >> So, half board and back and half horizontal.

0:55:56 >> Okay.

0:55:58 >> One more.

0:55:58 >> One more. Yeah. Be great.

0:56:03 >> And while you're doing that, uh K, uh just to orient us, where where is Drummond Street versus uh American Hill?

0:56:11 >> Drummond Street is here. Like this is the driveway access off of Drummond and this is facing American Hill.

0:56:17 >> Okay.

0:56:18 >> And also those the windows there will go away. The gable windows on this [clears throat] side.

0:56:23 >> Oh yeah. This is actually a better Sorry, we've been doing some last

0:56:29 >> letters and try to do a lot of edits.

0:56:30 >> We got a lot of emails. So we uh we made a few. So you can see [cough] um here is the drum inside. Um, and it's different than this one in the sense that we've eliminated these gable windows here to try and accommodate,

0:56:49 >> but but the entrance is still accurate.

0:56:51 >> We would love to leave that cuz we're shooting for the vaulted ceiling, you know, light. And

0:56:56 >> there's more storage.

0:57:02 >> All right.

0:57:03 >> Thank you. And would you both like to uh speak or add anything?

0:57:07 >> Sure. Hi, I'm Shelby KTO. Um, I'm the new owner of 218 Drummond Street. Uh, my husband and I currently live off of North Bloomfield near Edwards Crossing, an acquaint neighborhood off of a dirt road. The neighbors take care of each other and look after one another. And while we will miss the relationships we've built, we're very excited to be in town. We absolutely adore Nevada City and we planted roots here over the past several years, even convincing both of our parents, uh, one all the way from Virginia to follow us. This will be our forever home. I think we're all aware of how special this town is.

0:57:38 For its rich history, culture, arts, and community, and the care around preserving the architecture is part of what makes this town so unique. Even after years of walking the same path down Broad Street, it still takes our breath away. The brick facads, the corrugated metal roofs, the wooden balconies, the rot iron details, the window shutters, shingles, everything. It never gets old. We truly appreciate the time and attention that goes into each of these review meetings to maintain and preserve the town's history and charm. My goals with this project from day one were first and foremost to follow the guidelines outlined in uh the design guidelines for Nevada City document including height and setback restrictions.

0:58:13 Number two, respect and honor the aesthetic of historic Nevada city including roofing, sighting, and paint colors. And number three, which is really important to me, try to minimize friction with neighbors. Built in 1960, this neighbor has or this house has no historical value and does not align with the historic district architectural recommendations. So, it is with good faith that I'm aiming to resource some of that gold rush miners cabin aura. While the renderings in this presentation were AI generated to showcase the overall idea of the exterior, I generally stay away from using AI. I did not sloppily, lazy, or blindly use it to design this to design this house.

0:58:47 My husband and I walk our dogs around Nevada City every day. We support the small businesses and restaurants and theaters. We volunteer. We live here. I put a lot of thought into these plans, overwhelming my camera with photos of rusty roofs and corrugated metal in board and batten alongside photos of my dogs and family. Um, I've gained inspiration for this design over years of viewing the buildings and homes across all neighborhoods downtown up close and personal in an effort to keep it authentic and consistent. We've put a lot of thought and care into getting to this point and we're really excited about the opportunity to make this our home.

0:59:20 Um, we hope to be a part of this community for a long time and we sincerely hope that we could have your approval to move forward.

0:59:29 >> Thank you.

0:59:30 >> And would you like to go ahead?

0:59:32 >> One more.

0:59:32 >> Sure, please.

0:59:34 >> I wasn't going to get too involved. This is really Shelby's passion project and I I wanted to give her kind of more free reign to do this. So, I actually wasn't planning on really getting too involved, but she sent me all the comments last night. I think one of them was a 50page dissertation on city planning. So, and me having to read all of that, I got a little bit a passion. So, I put something together myself. So, if you'll allow me to indulge. Um, I thought I had a loud voice. Um, so I I just want I I want to share a bit of our passion and personal story and what set the stage for Shelby and me moving to Nevada City in early 2020.

1:00:13 Um, so I first, and it all ties into this home and this project. So, so I first visited Nevada City back in 2013, a few years after moving to California from the east coast. I was driving home from a skiing trip in Tahoe during a snowstorm that interstate 80 backed up for miles. I decided to check a map for nearby foothold towns where I could spend the night and avoid the long drive back to the bay. Nevada City looked like the perfect spot. I remember sitting down at Golden Era for a cocktail while live music played, completely in awe of the town. I fell in love with it immediately and told myself that night if I ever had the chance to move somewhere in the foothills or the mountains, this would be it.

1:00:46 That's a 100% true story. Um, so fast forward several years to when Shelby and I met, we began visiting Nevada City together. We both shared a deep appreciation for the vibrant gold rush history and the small foothill town that served almost as a time capsule to that era. Shelby in particular loves architecture and the diverse mix of foothill homes scattered throughout the town and surrounding areas. As an outdoor enthusiast, a local recreation access was also a massive draw for us. We made our dream of living a reality in 2020 and immediately immersed ourselves in the community. Shelby regularly volunteers with Wayward Journey, walking and fostering dogs, awaiting adoption, and occasionally volunteers alongside her mother at Sammy's friends.

1:01:20 I serve on the board of the Truckucky River chapter of Trout Unlimited and as treasure for the California Council of TU, working closely with local chapters covering the Yuba River, the American River, and the Sacramento Rivers. I also volunte volunteer my time as a financial adviser for the Sierra Trail Stewardship. We both have volunteered with Circle and donated funds to various local nonprofits. For over three years, I've been an active member of Nevada County Search and Rescue Team, serving as a team lead with nearly two dozen call outs this year alone, including recovery efforts in the response to the tragic avalanche in Tahoe. We are sharing this not to seek praise, but to strongly emphasize our deep investment in this community.

1:01:52 We are not outsiders placing a massive house on a tiny lot to use for 6 weeks a year or an Airbnb as one might do in Tahoe. There's a lot of these references to Tahoe. Um, our design approach was thoughtful and conservative. The lot is large for the surrounding area and while guidelines permitted a significantly larger build, we deliberately kept it to a singlestory three-bedroom plan, roughly 22% lot coverage, the home is uh only about 950 ft larger than the existing structure. We increased the size slightly to accommodate our families. My family in particular is scattered. My two older brothers served in the army and settled with their families in Colorado and Virginia, while my parents are divorced, my dad's in North Carolina.

1:02:28 They like to visit a lot. The additional square footage is intended for larger family room to host everyone along with slightly larger bedrooms for visiting friends and family without building something that felt too big relative to the lot and surrounding homes. I think we achieved that balance as best we could. The renderings are AI generated concepts and should be taken with a grain of salt. The primary goal has always been compliance with local guidelines. We select this neighborhood because of its diverse architectural mix ranging from mid-century homes to bungalows and Victorians. We expected this would allow some flexibility um to to with the build to accommodate some more modern elements like the windows.

1:03:01 The gable windows are priority to maximize natural sunlight particularly given the home's single story elevation. It's a lower position relative to the neighboring property and the surrounding tree cover. Additionally, the vaulted ceilings with uh with larger windows will serve as the living room where we hope to have many f family gatherings. We are bringing this style from our existing home where we have amazing memories of sitting in our living room with family sharing stories as the sunlight poured through the f panes and slowly moved down the walls. The light in the foothills is a draw for many of us who live here. John didn't call this era the range of light from nothing.

1:03:31 To align with the design standards, we modified the roof angles, incorporated vertical board and batten siding and historical black pallet and added corugated metal accents as a nod to the era's industrial ling history. Finally, we want to be good neighbors. This project replaces a 1960s era home lacking historical context with a full fully compliant resident that respects the neighborhood scale and diverse characteristics. If the guidelines present an issue that should be addressed separately. We we have followed all established guidelines or we feel we have and carefully throughout this process and as such we kindly ask for your support and approval so we can continue building our roots in this community.

1:04:03 So thank you.

1:04:04 >> Great. Thank you.

1:04:06 >> Any final comments before we bring it for uh none. All right. Come to the commission now for questions.

1:04:16 >> I've got one.

1:04:17 >> Yes.

1:04:17 >> What is the current gable height?

1:04:21 >> It is uh 14 ft off of the American Hill side and it is 16 ft off of the Drummond side.

1:04:29 >> Okay.

1:04:32 >> I'll follow up. Is that is that from street level or from grade?

1:04:36 >> That's from grade. From street level it would be significantly less on the American hillside.

1:04:40 >> Right. So that so the 20 the 20 foot height you mentioned before is from grade and not from correct. Yes.

1:04:46 >> Right. Because it might be like

1:04:48 >> 10 or 12 or something from American Hill.

1:04:51 >> Yeah. I would imagine it drops um two and a half feet or something from American Hill to the front door.

1:04:58 >> It's a little bit of a guess.

1:05:00 >> Sorry. What was Can you repeat the current and the um

1:05:04 >> the current is 14 ft to the gable um on the American Hill side. The gable does run the opposite way. So it's actually from the west side of the house is where the gable end is now.

1:05:18 >> Um and then on the garage side uh on the drum side it is 16 ft.

1:05:25 >> And that's 16 feet to the garage. 16 feet to the the garage is detached right now.

1:05:31 >> Right. I'm wondering what the 16 feet is measuring to the house cable.

1:05:34 >> 16 is the house gable to grade.

1:05:36 >> Okay. Thank you.

1:05:41 >> Other questions?

1:05:42 >> Uh Jessica, what's the what's the allowable ridge height uh in this area?

1:05:46 >> 35 ft.

1:05:48 >> Okay.

1:05:57 Um the the current the current uh house what is is the floor slab on grade or is it a a subfloor on on foundation?

1:06:07 >> It's a subfloor. It's it's actually a mix. I think this house has had a few remodels as houses in this uh area have. So it does have an area that has a slab, but most of it is a raised raised foundation. And is there any have you has have there been any engineering studies that would indicate that the existing foundation uh will support the structure you're proposing?

1:06:36 >> Well, I mean a singlestory structure is being replaced with a singlestory structure. So typically from the engineering standpoint, that's an acceptable assumption.

1:06:46 >> And and the stem walls appear to be the right height and the footings in the right places and

1:06:50 >> Yes. And honestly, the loadbearing areas are all going to require foundation um you know, there's going to be peers underneath the ridge beams uh on both sides of that big gable that's going to replace um the main roof. And so that that bears 90% of the weight um of the the middle of the roof there. So yeah.

1:07:15 >> Yeah. And and that and that goes to to um a possible presumption that more demolition than then uh then presented will need to occur for this to practically to happen in a practical way.

1:07:32 >> As far as like what will be required for the proposed structure?

1:07:37 >> Typically the foundation would be an addition to the existing footing. you don't typically have to remove the footing [clears throat]

1:07:45 >> and I foresee the subfloor staying intact throughout the house. Um, and then we we'd love to leave as many of the exterior walls as we can. Um, but I do see the American hillside and the the other side probably being replaced due to the engineer it it's almost 100% he's going to require balloon framing for those two walls. So, those walls will likely come down to the subfloor. I could see the west side wall and the east side walls remaining. Um, but honestly, if you go to this house, you'll see like the you could stick your hand through some of the siding in a couple spots.

1:08:25 So, we're not entirely sure what kind of rock we're going to encounter once we tear the sheetrock off.

1:08:30 >> And in terms of design development, you're pretty much at aesthetics and not not into engineering or

1:08:37 >> Yeah, you know, we didn't send anything to engineering. Obviously, that's a pretty expensive process and until we got approval for the roof line and windows and all that stuff, we wanted to go through that process before we sent it and spent our $8,000 with the engineer.

1:08:56 >> Okay, thanks. Any other questions from the commission? Uh guidelines aside, if you could keep the current roof line as is, would you?

1:09:10 >> Oh my god, thank you for asking 100%. Yeah, that was my original plan. Um but because of the guidelines, I think they recommended steeper.

1:09:20 >> It's a 412 on the existing.

1:09:22 >> Yeah, I love the roof line as it is.

1:09:29 >> Okay, any other questions, Amy? or anyone else?

1:09:35 >> No, just a million comments. [laughter]

1:09:37 >> Okay. All right. There are no more questions. I'll take comments from the public. So, is there anyone who would like to make comments to the commission on this item?

1:09:51 >> Someone you.

1:09:55 >> Hi, my name is Reette Senum. I'm uh at 214 Drummond Street. I'm your neighbor. Nice to meet you guys. um former city council member mayor and I'm a little surprised by this application because there's a lot of discrepancies and this is such a dangerous precedence in that we know if you allow small homes which the last person that lived here was a renter. If you allow small homes like this to be demolished, and this is not like, well, we're, you know, we may, may or may, or may not demolish. Within the application, it says we have we're going to remove all walls. We're going to remove most walls.

1:10:29 We're going to remove portions of walls. There's no clarity of what walls are going to be removed. And when you start to remove and demolish homes like this, you're taking away the small housing stock that we so desperately need. You can't you can't return it. And I want to make this very clear, too. I am so unclear on what this is going to look like as far as height. I went out yesterday with a bunch of bamboo poles and put a a balloon on top of it according to what was in the plans. And this thing was so high and so tall that Elena Breen, who's going to be right next to them uphill, will not only lose her morning sunlight in the winter, but she will have no view whatso whatsoever from her home or from her property.

1:11:14 We need to know what the elevation is of this. And there's the other discrepancy in that we're being told there's going to be very little excavation. And yet when you look at the plans, it looks like it's going to be like 7 ft, 6 feet are going to be excavated. And either it's going to be excavated and the house will be lower, the garage for the garage will be excavated, or it's going to be sitting up higher and the house is going to be higher. as the plans currently stand from what I can tell in the drawings is the the actual um the actual foundation right now because I look at it all the time is about this much.

1:11:47 It's a black is it's concrete slab. That's the foundation of the house right now in the drawings. What I can tell is the drawing they're actually about like 3 and 1/2 ft of slab from what I can tell. And again, we don't have the numbers so we can't really tell. And this is the most prominent piece of property on American Hill. It does not sit back like the one that was example of of Linda Sloven's place that's back in the trees. This is the most prominent. These are small bungalows. They're tiny. They're very low. They're set back. They're not big. And this will dominate the whole entire neighborhood.

1:12:19 It like literally puts in a monkey wrench of the character of Nevada City. And I believe that what we need to do is go back and there's a ton of missing elements that we have right now in this application and we need to see exactly how high is this going to be. We need to see corner to corner because right now our Airbnb is 15 ft from this. Our Airbnb the you know Zen cottage retreat is going to be having windows looking down on the back deck. It's going to be looking right into the not only the bedroom but the bed of the cottage. My bedroom is right there 20 ft away.

1:12:52 My view is gone. It's just it's a towering wall. And again, maybe it is or isn't. We don't know. We need to have a review and it has to come back to you guys. Thank you.

1:13:01 >> Great.

1:13:01 >> Thanks.

1:13:02 >> Thank you.

1:13:04 >> Is there anyone else who'd like to make a comment at 217 Drummond Street? Um, and I built my Our house was built in 1988. It's a c it's the only custom home on that side of the street. I know that you showed the those homes over there and you said they were three stories, but they're not. They're really a two-story home, but we're on a big slope going down like that. So, there's no three-story homes on that side of the street here. You know, when we built the house over there, we actually complied with everything that Nevada City wanted. This Victorian architecture, um, we're surrounded by many homes that are built in the 1800s there.

1:13:47 And I I I'm as much as I I'm excited that you guys are coming to the neighborhood, we love young blood in the neighborhood as well. Um you know, I just feel like it doesn't quite fit. That Tahoe style house just doesn't quite fit in that neighborhood. And anyway, that's my opinion.

1:14:06 >> Thank you.

1:14:06 >> Thank you.

1:14:13 >> I'm Susie Hardy. We're at uh 219 Drummond Street and um we took a picture with the balloon for the height and I have a picture of it and it's just it's devastating. We would lose um all of our afternoon sun. Um I don't know if you want to see the picture of it or not, but I have it available.

1:14:36 >> We we were provided uh in the in our in the packet that we received with public uh letters. We did see that picture. Oh, you can.

1:14:44 >> Yeah.

1:14:44 >> Okay. Thank you.

1:14:52 >> My name is Barbara Romer and [clears throat] I live at 325 American Hill Road and I'm pleased to meet new neighbors. I'm glad you'll be in the neighborhood, but I wish you'd return to the design guidelines and that the committee would put off the decision today to approve proceeding because I think we need a lot more dialogue about what this building could look like. The reference to the other Tahoe chalet style um the wax home on the corner of American Hill and Lost Hill Court probably wouldn't be approved today with the constraints that we face in the design guidelines and the reasons for that are many and as [clears throat] in this case one could argue on both sides of the question.

1:15:38 So I think there's it's just too laden to make a decision today. I think the darkness of it is troubling. The siding is troubling. The pitch is troubling. The fact that the setbacks seem to be so small, even though they may be the same on on one wall um on the west wall as they are now, the fact that the building is so much larger and so much taller. There's so much more mass there makes it feel uncomfortable for those of us who were looking at it from across the street or from next door or from behind as Reette does. Thank you.

1:16:12 >> Thank you, Barbara. Anyone else who would like to make a comment today?

1:16:21 >> Seeing no one, I will bring it back to the commission for discussion. Is there anyone who would like to start off with any comments or discussion? Amy, I think you had some things you were ready to say before.

1:16:37 >> Um, I always like to hear what other people have to say first. Sure, [laughter] I'll start. Um um this one's a doozy, guys. Sorry. Uh and thank you to all the neighbors for showing up and contributing to the discussion. Um when you move into a neighborhood, your neighbors are your daily life. Um and I I really hope that we can find a happy um solution to all of this. I think that we will um I'm really glad that you showed us those updated versions uh where the the roof pitch seems a little bit more subdued uh where the windows are also kind of brought in.

1:17:26 When I was first looking at the imagery in the packet, my thought was very similar to a lot of the comments that in spite of the fact that yes, American Hill maybe does not have a consistent architectural style, in spite of that, this design did stick out in a way that didn't feel consistent. And this is one of the troubling aspects of being a planning commissioner sometimes is that as much as we try to make the guidelines um clear and directive, sometimes there is a feeling sometimes it's curatorial and that gets really difficult to navigate. Um my question in looking at it is you know where is the house that you bought in the design that you're presenting?

1:18:13 Uh, and I I think that that kind of brings in a lot of the concern and uneasiness from from neighbors and from myself perhaps. And I think that this new rendition that you showed us, I saw more of the house in that rendition. And I hope that the other members of the neighborhood who are here watching were able to see that. I encourage you to look at it again. Um, I think that there is historic value in a ' 60s bungalow. Uh, I think that where there's having having renovated a couple houses myself, um, when you can find wood that was harvested pre-1980, there's a much higher quality to it than what you're going to get now.

1:18:58 Um, so anytime I see someone trying to tear down, trying to anytime I see major changes being made to a house from that era, I would encourage hitting the the brakes a little bit and reconsidering because the quality of material that you're going to get now to replace what you take out um is not going to be nearly as good. Um my thoughts to to wrap it up are that I would encourage it to all be board and batten to the extent possible. I think that that is the look that was on the bungalow. Is it currently though?

1:19:33 >> I'm open totally open horizontal lap side.

1:19:38 >> There's board and horizontal.

1:19:40 >> Okay. In that case I either way um I would encourage to keep it consistent. I think a lower roof profile would solve a lot of the concerns. Um, I would also encourage you not to put lights underneath the eaves.

1:19:53 >> Um, they look beautiful in rendition, but I think in actuality you're going to get a lot of spiderw webs and it becomes a maintenance issue and then you have to change a light. It's this is just a personal thing.

1:20:03 >> Yeah, I added that. Yeah.

1:20:05 >> Okay. [laughter] Good. Good to know. Good to know. Um, uh, I think that, um, the house is a dark color already. To to comment back to the the public the color itself, I sometimes these AI images or renditions can look a lot more alarming than they actually become. Um, but I would also encourage you to try and keep it more to the spirit of the bungalow that you bought. Then, um, what there is this kind of strange gradient where it becomes something that's like, you know, from Truckucky. And while Truckucky houses are beautiful, they stick out in these neighborhoods. Um, and there's nothing wrong with a Truckucky house.

1:20:48 Um, but I would love to see the spirit of this house come out more in these um, images. And the last thing I'll say is that I don't think that any corrugated tin sighting is a good idea.

1:21:04 >> Thank you, Amy.

1:21:06 >> Um, anyone like I can jump in unless someone else would like to uh, comment.

1:21:12 >> All right. Uh I wanted to you asked a question before to the applicants if uh the original roof pitch would be acceptable. Um and so because I do understand that you've increased the roof pitch in general uh alignment with what with what is in our guidelines. Um that said you know in in general if it is existing you know we would we allow that to continue and I think that would be acceptable here. that would reduce the the height of the roof and it sounds like based on what you said you preferred that

1:21:45 >> my preference you preferred that

1:21:46 >> anyway to pay for more heating than I need to so the lower

1:21:50 >> right um uh I I do want to come to you know if you look at our design guidelines there's a specific call out early in them about the context of the neighborhood and that's always a bit of a judgment call you know on our part you know and appreciate everything Jessica did to show examples and a lot of the details of the other houses that are in the neighborhood Um, but it is it does refer to this neighborhood, right? And I understand there is corrugated around the rest of the city, but I don't see it in this neighborhood and I don't think we don't usually see it.

1:22:20 I'm sure there are some exceptions, we don't usually see it in some of the older neighborhoods uh that we have here, you know, on houses. And uh kind similar to what Amy was saying, I think you know having a consistent um wood or hardy board sighting um around the house uh would in general be more consistent with the neighborhood as well. Um let's see. I'm glad to hear uh what you said. The uh under Eve lighting is uh not part of that. Um uh my the other uh challenge that I had in particular was those windows that are in the eaves. Um that is you know a very especially in that sort of modern you know directly following uh the profile of the eaves that is a very modern touch and you know quote unquote Tahoe.

1:23:10 Um, I think there are other examples in the neighborhood in in in the city where uh there are windows that are in ease, but they're in a more traditional style. I think incorporating something like that that you might see on the other houses uh would uh greatly improve the feel and make it fe feel more of Nevada City. Uh let's see.

1:23:33 >> If the roof is lower, then those windows won't fit. So, yes, I think it'll match a lot better. I think those are the main things I wanted to uh bring up. So, I'll hand it over to anyone else who would like to comment. Tom.

1:23:52 >> Yeah. Um um so we have we have two words, compatibility and uh uh consistency. Um so are we working with consistency today? consistency with the neighborhood.

1:24:11 >> They're can they can be construed pretty differently.

1:24:13 >> Well, let's we can go to the guidelines and see spec the design guidelines and see specifically what's

1:24:18 >> I think of it as consistency within Nevada city and compatibility with the neighborhood personally.

1:24:26 >> Okay.

1:24:28 >> Yeah, we have compatibility is in the findings, but that's a good question. We can verify that to make sure

1:24:36 >> compatibility is a broader term and consistency is is is more limited I think to the to the vernacular and and quoting from the design guidelines. You know this is architecture review outside the historical district existing residential neighborhoods. The paragraph reads new projects additions to homes and renovations as well as construction of new out blah blah blah that's new stuff must be generally compatible with Nevada city style of architecture. And Jessica specifically called out the difference between motherland style and Nevada city style. So the word is compatible in the guidelines and then that refers to the context of the neighborhood which is discussed earlier.

1:25:14 >> Okay. So and that that's uh framework. Um, first of all, I want to I want to compliment Jessica's really thorough staff report and your willingness to um modify hear what Jessica had to say and um so uh that's those are laudable efforts. Um um it so the the rendering the alarming uh AI rendering that it was in the original staff report is just it's uh it's it's absolutely a suburban trucky house. Um and the color black or dark gray doesn't help dissuade that um impression.

1:26:04 And uh architectural fashion, you know, is pressing inward. Um,

1:26:10 >> can I show it to you in a different color?

1:26:11 >> I put [laughter]

1:26:13 >> that helps. That helps.

1:26:16 >> Now,

1:26:17 >> okay. Um, yeah. Um, good.

1:26:20 >> Different looking house.

1:26:21 >> And I [laughter] I I think I think I think we don't specifically regulate color.

1:26:26 >> That's a historical color

1:26:27 >> out outside the historic district. We don't specifically regulate it, but it does inform the design intent and and the feel. So, um, yeah. So that that's a step in the right direction. Uh it it's still it's a very contemporary house. It's a very contemporary house and even the new houses in your area generally um uh strongly allude to the Nevada city and mother lode style architecture really traditional forms. the uh the the the moldings around the windows, the casings uh help a lot. That's that's that's definitely a movement in the right direction. Um and uh I think one of the commenters talking about the prominence of this house um uh didn't overstate it's it's it's kind of a flagship of the neighborhood uh topographically, if that's the right term.

1:27:27 it that it it um that spot that corner just presents it and almost makes it the centerpiece of that little region. Um so it's it it's aesthetic compatibility um matters to your neighbors. Uh, I mean, part of part of part of I mean, a lot of what we what the design guidelines and our historic uh ordinances uh seek to do is um I hope to say this well, but but uh we love Nevada City. We live here because we like the aesthetic and the uh the implied bargain is that we've all agreed to these aesthetic values.

1:28:14 And so, um, that that's that's in a general sense. And I think, um, and and I appreciate your passion for design and architecture, um, uh, and, uh, coming closer to the aesthetic that surrounds you. um uh is is um honors this agreement that that that that we kind of have and that that our code help is trying to spell out from a regulatory standpoint. Um so the elements that that concern me are the the clear stur windows. Um and obviously they're desirable. Why wouldn't you love that from the interior? Um and but it has a strong uh contempor contemporizing effect on the exterior.

1:29:05 Um the uh uh I I think for for an architectural review approval, we would really need to have this a lot more detailed. Um including like what the garage door looks like because that's a pretty prominent elevation. Um the um there's a a canal levered front overhang in one of the versions uh that's uh very contemporary and not in any way in keeping with the aesthetic around you. Um, and I'm I'm with uh I'm with somebody on the the the cor the corrugated metal is a kind of a a modern version of of rusticity and it it's it's kind of artificial.

1:29:58 It strikes me as that. Um and and I maybe you're moving away from the corrugated. I don't know. But the

1:30:08 >> Yeah. Um and the the sophet lighting um it says look at me please look at me a lot.

1:30:17 >> I think that was going that's going [laughter] on.

1:30:21 >> And landscape up lighting same thing. Won't you please look at me? Um it's uh it's great. It's great in other types in other cities. Um um and and then uh I just want to speak in defense of the funky little 1960 ranch. I think it's ranch, not bungalow. Um it's not without charm and and as an architectural architectural architectural sampler that your neighborhood is, it it it's it's really charming, you know. Um and and I understand that it may not work as your forever home. Uh uh but uh I I think it's likely that something like 100% demolition is going to be required when when push comes to shove.

1:31:13 I've done one of these myself from my own home and we can save it. No, like we saved it but at great expense and at great trouble. Um,

1:31:23 >> you replicated it.

1:31:25 >> replicated it. Yeah. Um, um, so um, that's the extent of my commentary for the moment, but but it's just very very contemporary and really strongly so in its context.

1:31:50 >> Thanks, Tom. Anything else? No. Yeah.

1:31:56 >> Well, I grew up in Truckucky, so I looked at this and thought it was gorgeous, but I but [laughter]

1:32:02 >> I think we all thought it was gorgeous.

1:32:03 >> It's gorgeous.

1:32:05 >> But I also that my second thought was that it didn't seem to quite fit for that neighborhood. So, I think that that the suggestions that have been given by the other commissioners would make a lot of sense to consider.

1:32:16 >> Okay. Thank you, Michan. Anything you'd like to add? Yeah, I don't know. Same I mean, same things with you guys. I'm wondering too if the balloon pictures those are are those based on the 59? I mean, I just think that seems to be a a big issue in the community. And I I think if we can see where they actually where the lines actually are. Um that might help people.

1:32:41 >> Proposed building is it it would not be out of place in the neighborhood. The the surrounding homes are are just as tall. So maybe not the one on the uphill side of Drummond, but certainly on the downhill or on the uphill side of American Hill, but it's certainly going to be shorter than the one on Drummond.

1:32:58 >> But if we have approval to keep it as it is, then that's ideal.

1:33:03 >> Yeah.

1:33:04 >> For everybody, I think we can do that, right?

1:33:07 >> Oh,

1:33:09 >> um I think if you wanted to fall, you'd want it to be six and 12 minimum.

1:33:13 >> Lower the roof line.

1:33:15 >> It would lower the roof line to go to a six and 12.

1:33:17 >> Go smaller. Um, is the one in your

1:33:22 >> um

1:33:24 >> is that one 6 and 12?

1:33:25 >> This one's an 812.

1:33:26 >> That's 812. Okay.

1:33:27 >> And and refresh us. What is it today?

1:33:30 >> It's a four.

1:33:31 >> Four and 12. All right.

1:33:33 >> And the one in the packet, what was that?

1:33:35 >> 8. And this is eight. But then you could go to six.

1:33:39 >> Yeah. Consider go to six and stay within I think the reasonable design idea of what you're looking for. And then as far as the window, just a followup, if we still wanted to have a window in the gable and we did more of a rectangular window or something like that in the gable, is does that seem more compatible? Because you do see that throughout Nevada City often. That's what I have

1:34:05 >> and I love it.

1:34:06 >> The little like the rectang

1:34:15 windows.

1:34:17 >> Yeah, just try to speak into the microphone too. It will help with everyone here. Um,

1:34:22 >> sorry. You had a question, Tom?

1:34:24 >> Well, I was gonna I was going to if if I could jump in on that. you know, a a group of three, a tall central window and two and two smaller square or rectangular ones would give you nearly the same amount of light and have a a a barn or a a barn aesthetic might work well for your

1:34:44 >> what you

1:34:46 >> um what you're trying to achieve in terms of living space. Um uh and I was going to I just wanted to make a comment that that a higher roof pitch in in a steeper roof pitch like 8 and 12 versus four or six in service of a contemporary design doesn't get us closer to the intent I think of the design guidelines. uh it um so I I think a lower pitch like six would and and that's that's the minimum pitch in our uh objective design standards in in a in a more in a more um contemporary design that that pitch I don't think

1:35:29 >> reducing the pitch is a good thing.

1:35:34 >> Uh okay any other comments? The one last thing I would add, um, thanks Tom for bringing up the color. I forgot my comments there. Um, yeah, in general, I think the com the colors that you have on there and improvement, but the black trim in particular is we've had many discussions about that in the planning commission. You know, it's a very contemporary detail. Again, if you can look more to the colors around the neighborhood, you know, and seeing what else is there. Um and uh going in general that does seem to be darker than most of the colors in the neighborhood based at least on my uh walk around and and look.

1:36:11 So you know as you're making improvements please consider uh changes

1:36:16 >> the windows.

1:36:16 >> The windows but I would say the body as a whole uh

1:36:20 >> okay.

1:36:22 >> All right. Any other comments?

1:36:24 >> Um

1:36:25 >> or discussion I should say.

1:36:26 >> Go ahead. I wonder I wonder if this is the if this is a good case for a continued architectural review.

1:36:35 >> Uh continuing this I don't I don't think we're going to prove it today. We I think we in general we need to agree we we agree that uh they need to come back to us with the changes. Are you asking about um

1:36:48 >> um

1:36:48 >> Am I getting the words wrong?

1:36:50 >> Yeah. uh

1:36:52 >> where two of us sit down with them in a separate

1:36:55 >> right

1:36:55 >> advisory review committee advisor

1:36:57 >> an arc review that's be good

1:36:59 >> yeah I think adi I think that would be helpful here tell so what this is is you know in some cases where there's a lot of things to go over um two of the commission members uh and uh the city planner will meet ahead of time again this is just input from two of the commissioners it's not binding or um doesn't necessarily reflect, you know, anything other than, you know, those two folks, but it does help move things along hopefully before you come to us with the full commission with a full uh application and all that.

1:37:32 >> So, agreed.

1:37:35 >> Okay. So, I think with that, I think the what would we just continue this?

1:37:40 >> All right. Um, so I guess I need to make a motion to continue. I move that we continue uh this item to a future date to be determined. I'll second.

1:37:50 >> Second.

1:37:51 >> I think all in favor, please say I.

1:37:53 >> I.

1:37:54 >> All right. Any opposed?

1:37:56 >> Great.

1:37:57 >> Thank you.

1:37:57 >> Thank you very much.

1:37:58 >> Thank you.

1:38:04 >> And thank you, Jessica.

1:38:06 >> Yes. Thank you.

1:38:08 >> That was a lot of work.

1:38:10 >> Yes, it [laughter] was.

1:38:13 >> Okay. The next item is 223 and a half Broad Street. uh variance and architecture review amendment.

1:38:22 >> I believe [snorts] I have to recuse myself for this. This is um

1:38:26 >> Yeah, this is Odd Fellows.

1:38:28 >> Oddfellows. Yeah. Okay.

1:38:30 >> I have to recuse myself from this one because I own a building within 500 ft.

1:38:35 >> Is it okay if I sit in the audience for it?

1:38:37 >> No, you're supposed to be outside.

1:38:38 >> I have to be outside. Okay.

1:38:39 >> Yep.

1:38:39 >> Cuz you might convincing [laughter] way.

1:38:43 >> Oh, you don't have an

1:38:43 >> All right. Applicants, please come forward. Jim,

1:38:45 >> I was actually covered in one of our training sessions. [laughter]

1:38:51 >> Uh, it's only been

1:38:52 >> Commissioner,

1:38:53 >> it's only been an hour and a half.

1:38:56 >> I mean, they totally

1:38:57 >> I asked the people, we're going to continue the meeting, so if you have discussion, please uh move on outside.

1:39:07 >> Might have to say it louder. [laughter and clears throat]

1:39:09 >> Lost Jim's coming back with more materials. Rodney, our clerk is telling me that you'll need to announce Amy's recusal after the event starts.

1:39:21 >> Ah, got it.

1:39:22 >> Okay.

1:39:26 >> No, no pee breaks or anything.

1:39:28 >> Do we need a break? Does anybody need a break or

1:39:31 >> I wouldn't mind one.

1:39:32 >> Okay, we will take a uh brief intermission here. Thank you for 10 minutes.

1:45:47 I will. Yeah.

1:45:48 >> Okay.

1:45:53 >> Oh, Amy's recusing recusing herself.

1:45:56 >> Yes, I will officially announce it. Um,

1:46:00 >> okay. Um, we're glad to return with our project fellows.

1:46:04 >> Hold on a second. We I got to do this stuff here. All right. bring us back to order here. Uh and we are talking about 20 two 223 and a half Broad Street. Uh the Oddfellow's variance in a minute architecture review application for a new vestibule. I'll note that uh Commissioner Cobton had to recuse herself due to the proximity of the uh residence that she owns. And with that, I will give it to Jessica.

1:46:34 >> Thank you, Chair and commissioners. Again, I'm Jessica Hen, city planner. And yes, this application is for the Oddfellow's Hall for a variance and an amended architectural review. Um, the planning commission had previously approved architectural review for a new vestibial at this location. Um, and I'll get into a little bit of the background on that here. Um, the Oddfellow's Fraternal House on Broad Street uh was constructed in 1873 and it is listed as a contributing building in the historical district. Um, a little bit of history on the site. The structure has um it has changed over the years, so that may u be an influence here in the decision.

1:47:21 Um, originally there were six pillars at the Broad Street curb that supported a canopy over the sidewalk. Um, there were five windows facing the street and on the second story and those were arched windows and of identical size and they were framed by six pillisters. Um there was a new entry with a larger larger plate glass windows that were installed um in 1904 and then following those 1904 changes structure remained about the same until 1954 when there were some and more dramatic changes to the structure. The upper arched windows were replaced at that time with rectangular double hung windows in 1913. The awning was removed in 1924 [clears throat] and that was hailed at the time in a newspaper article as being a very modern improvement to remove the awning.

1:48:15 [laughter] The most dramatic change after 1904 occurred in 1953 as a result of the drugstore expansion on the ground floor when the sign band was lowered to provide more commercial sign space. And that change obscured the tops of those columns that I mentioned, resulting in a lower window height. And then the um transom windows above the double door entrances were removed. At that time, all of the windows were reconfigured and the double door entry on the west side was changed to a single door entry. Um through all of these changes, so you can see this is the the original structure on the left. And then um this is a little bit of an older photograph, but this is essentially the same today.

1:48:59 You can see those windows are uh very different from what they were originally and the pillisters are gone. Um through those changes, this single central entry with the staircase has remained. Um so the property is accessed both from from the Broad Street and Spring Street side. Uh it is in the general business district and in the historical district um which the purpose the purpose of which is to um provide appropriate and reasonable control of the appearance of properties within public view. So, um, that's just a little bit of background. And then, uh, the commission may remember or some members may remember that in February of this year, the commission approved an application to remove the existing central rollup door on Broad Street and construct a new vestibule and door to provide a secure entrance and safe emergency access.

1:50:00 Um, and there were a number of concerns raised at that time. um commission received some comments from the historical society and the commission had some questions about the project. So those are all discussed in the staff report, you know, why this project even needed to happen in the first place and whether the rollup door could just be removed. And we discussed at that time that the project the purpose of the project was to provide a secure entrance um that there were liability issues with people wandering up the stairs. Um, and then the entrance, the stairs themselves and the the actual uh doorway needed to meet building code requirements for egress.

1:50:42 Um, and with the rollup door in place, if if there were a fire upstairs and that door were locked, there would it would be devastating for people inside of the building. Um, so this would would help with with those possible issues. Um and then the building code as well. The um Oddfellows had gone to the building department before that application and received their feedback. They said that that particular application looked fine and um they had given them some feedback on the landing at the bottom for ADA accessibility. Uh but after the project was approved by the planning commission, the building department um said, "Well, actually, now that we're seeing the plans, we have some more detailed comments which resulted in some changes to the project."

1:51:33 So that's why you're seeing it today. [clears throat] Um couple of other concerns at that time was whether it would encroach into the sidewalk. Um the the previous project did not and this one doesn't either. Um the other let's see other questions were from the historical society about the loss of the building's historical integrity and on this um point it was discussed that the rollup door degraded the historic integrity of the building and the project was a functional update and really needed for functionality and um was a sensitive treatment architecturally. So the commission approved that permit by a vote of 4 to one with one com or 4 to zero rather with one commissioner absent.

1:52:22 Um and um the city at that point after that received an appeal um of that permit which almost made its way to the city council until it was discovered that it needed to be changed. And so the item was pulled at the last minute um from the appeal process and uh [clears throat] and the and the whole application has been modified a bit. So that brings us to today. Since since that time, um there have been a lot of conversations uh staff has had conversations with the state um division of uh state architect and um with the building department about the project.

1:53:08 The applicant has also coordinated with the historical society and um had conversations with them as well as the building department and um the building department has or the sorry let me say this first. The state has indicated that their only involvement in this would be if the project were appealed because the local building official disapproves alternatives based on the historical building code. That's when they would get involved uh with the project. So they weren't really able to help us in terms of the like the architectural historical treatment of the project itself. Okay. So the first item here is that there there is a variance that um the applicant has now applied for due to the required findings for exterior modifications in the historical district.

1:54:00 Um the findings include substantial conformance with the mother lode type of architecture. this the the materials and the colors themselves. Um as a commission previously found are uh sensitive treatment or at least that is that was the finding at the time and staff continues to recommend that that is the finding that the materials and colors are are similar to what was approved before or the same but the vestibule itself is not an architectural feature that is found in the historical district on other buildings. Um and so for that reason, a variance would allow the applicant to proceed with the project not making that particular finding uh because it is out of alignment with the municipal code if we can find that there are physical hardships applying to this property that are unique to the property.

1:54:53 Um so that is why there's now a variance application on the project. Um for the the project itself, I'll describe this a bit here. Um these are some of the changes that have been made. The door entrance width has been modified. Um it's larger than it was previously. Previously there was a single 36-in door. Now there are two 25 1/2 in doors. This was one of the building department's concerns was that essentially um the stairway coming down has a I believe it's like 54 inch width uh coming down the stairs or 52.

1:55:30 >> The minimum is 48. Okay. And so the the stairway width is is wider than the doorway. So what would happen in the event of a fire is that if the if the doorway is not wide enough um there would be a lug backing up um if everybody were running out of that of the door. So they required a much wider entrance um which resulted in those two double doors instead of the single door. Um they also are requiring a panic exiting device and an automatic ADA door opener. The landing um they also determined needed to be extended from 24 in to 33 in from the last step.

1:56:10 And then um while all of these changes were under discussion um it was determined that let me pull this plan up here. I'll look at the cross-section that the existing p so this is the existing slope right now is at 2.8%. And to get that a little more level for ADA accessibility that that could be uh lowered and then the proposed landing would would be much uh more level than the existing at one about a 1% slope. So that resulted in the vestibule also getting extended about 6 in from the previous approved depth. So the doors now would swing about 10 or 11 in beyond the steel column.

1:57:01 So everything is still behind the steel columns you can see in the plans that were provided, but when the doors open, they would extend out um beyond them. And according to the plans, because it's only 10 or 11 in, um, they wouldn't extend out into the public right away into the sidewalk. The sidelights [clears throat] on the vestibule are also now proposed to be removed. Um, and then the the the um I'm sorry, the sidelights in the front of the vestibule are proposed to be removed. And then on the sides, the single side lights would be replaced with double side lights. Um so again in our conversations with the building department they have indicated that historical building code exceptions that maybe could minimize this project a little bit more reduce its size that those cannot be applied to this project due to the accessibility and safety issues with it.

1:58:05 >> [cough]

1:58:06 >> I'll move through these these um elevations a little bit more. So you can see here those are the provided elevations. Um and then the other part of the project proposal to note is the um the proposed doors. Um so these are kind of the half glass style. There's some etching in the glass that's proposed with the Oddfellow's insignia and then a curved transom window above the doors. Okay. So, in [clears throat] terms of the variance, there are special circum physical circumstances um staff believes in doing the analysis on this that apply to this property that do create a unique constraint on their entrance.

1:58:57 Um the existing entrance is recessed. The staircase is located behind these columns which um really kind of constrain uh what can be done uh with this with the entryway and how the doors can be placed on it while providing accessibility and safety improvements. Um the rollup door itself again is not an appropriate accessible safe or secure entrance as well. Um and then the building department has said that there are no alternatives that we can apply from the historical building code to the project. Um so in terms of all of those conditions, um staff is recommending that if if we were to apply the strict historical district architectural standard to this site, we would the the applicant would not be able to make a safe and accessible improvement to their property.

1:59:54 >> [clears throat]

1:59:56 >> So staff is recommending approval of the variance application. um but just in relation to the um this the substantial conformance with the motherload style of architecture and no other departure from the code in terms of the architectural review that's it is tied into that variance uh obviously um but what stuff has done now is to do a review not only against our own code which actually is our code is written um in the language of the department of the interior standards for histo for treatment of historical properties. Um but the the department of the interior also has other documents that can give us guidance for this type of addition to historical structures.

2:00:43 Um in particular in their standards for rehabilitation um their standards 9 and 10 pertain to this project. They say um new additions etc will not destroy historic materials features and spatial relationships that characterize the property. The new work will be differentiated from the old and will be compatible with the historic materials features size scale and proportion and massing to protect the historic integrity of the property and its environment. Um so looking at this particular particular uh standard um the applicant has made steps to you know try to make sure that this this addition is compatible and and planning commission did find it the previous design was compatible with the materials features size scale and proportion.

2:01:37 Um but it shouldn't look exactly like the building because we want to be able to tell where the original entrance was. Um and so um so that is something the commission should be considering in their uh in their approval and staff is recommending that that that is that does occur with this proposed project. The other standard is new additions will be undertaken in such a way that if they're removed in the future the essential form and integrity of the historic property and its environment would be unimpaired. So, we would be able to if we can remove that addition later if if an extensive renovation of the project were to occur, um then we could meet that standard.

2:02:19 And the um designer that's been helping with this project has indicated that that it it would it would probably rem if we were to remove it, it the um addition, it probably would remove some of the sighting with it. um but that that sighting is not original sighting that's on there at at at this time. In any event, um so the um historical building code recommends that the alteration be unobtrusive but distinguishable and removable. Um again the existing role of door is not historic or of unique architectural entrance. Um the facade right now is not part of the original um or 1904 building features and the vestal has been minimized to the extent that the code required landing and eress width permit.

2:03:14 Um and the building department is allowing that landing to be shortened up just a little bit by 15 in to remain behind the columns. So they are giving some allowance uh for that. So all of the standards and staff's analysis of those are included in the staff report. I won't go through all of those right now. Um but staff has found that um this project does conform to to the standards. Um and then one last note on the transom windows and the glass etching in the door. Um that's not something necessarily excuse me seen or you know found widely in historical district buildings. Um but etched glass has been around for a a very long time.

2:04:02 It was used in California um at the time that this building was constructed um particularly in more kind of affluent households um residential construction hotels and commercial establishments. And obviously this is a a larger commercial establishment. Um and then in terms of the rounded or arch transom window. Um those also actually came into style in the late 19th century. Um and the shape of of that transom window being arched at the top. That is not a shape that um I was able to find when I walked around downtown. Um but in the case of the project um we could see that as echoing the original arched windows that are on the front of the building.

2:04:53 Um and then finally the engineering department has reviewed this proposal and um found that it doesn't significantly encroach into the public sidewalk space. Um it doesn't doesn't actually encroach unless those doors are open like I mentioned. So staff is recommending approval of the variance and amended architectural review applications um with the findings that are shown and conditions of approval in the staff report. I'm happy to answer any questions.

2:05:22 >> Thank you.

2:05:22 >> Thanks. [clears throat]

2:05:24 >> Would you like to add anything?

2:05:25 >> Thank you very much for your comprehensive work on this project, Jessica. In any case, um one thing that there is I did find a arch transom there at the Foley Library. Um, it's a big one, but there is one in town. Um, the other, uh, comment I guess I want to have is is the, uh, when they remove the rollup door, there's plywood that's basically covering an arched uh, previous arched entryway and that will be reestablished. So, when when the when the rollup door's taken off and the plywood was gone, it'll reestablish that arch. Um, another thing if in the future we're thinking of is we would like to eventually um make modifications to that skirt um that drop down drops down in front of the u those cast iron pillars and columns and they're Greek architecture I guess.

2:06:19 Um we were researching that this morning. It's it's very unique. It's it's a Greek type column with a motherload swing to it or something. But any case, u there's a a few slides I'd kind of like to show in the presentation to give an idea of the history. And

2:06:38 >> I guess uh you know the original building uh there was an odd build built in uh [clears throat] I think it was uh anyway I got my nose here.

2:06:49 >> The original was 1853 I think.

2:06:51 >> Yeah, the original was 1863 and it burned down at the end of the year in 1863. So they were determined to make the new hall uh which was finished in 1873, 10 years later uh far far more fireproof with the steel doors covers on the steel on the windows. So next slide please.

2:07:15 >> Yeah, you can see the iron doors that were in the front and and they did they built the uh the porch very soon after the original completion of the building. Next slide. And here's an interesting photo. U Mary Miriam researched this through newspapers.com. And this is where the te the original telephone company was in the vent benton drug venton drugstore was given the contract with sunset telephone company. And they had the switches in I guess upstairs in the second floor. So but you can see the cables running down probably ran up through the the staircase. And this is right before they paved paved the road with the asphalt and materials.

2:08:00 And and here's the the one of the major changes uh when the columns were put in. So it was must have been a difficult engineering problem because they had to put two big I beams in and and they were supported uh with those steel columns. And anyway, next slide. Um, next next picture. And here you can see the tops of the columns a little bit, but this was when this uh project was completed and completely changed the front of the building. Next slide. And here's when the um trolley was coming up Broad Street. And you can you can see the [clears throat] um the electric electrical lines were brought in.

2:08:48 So I guess next slide. Another picture showing all the cables going in from the telephone. And this is before the major replacement or changes to the to the second story windows. Next slide. Next slide. And there it is. I don't think it was a great improvement to the beauty of the building, but there it is. It's more functional. Interesting how they took out as as Jessica pointed out the the columns that were between the the arch windows. Two of them are gone to put these double hung windows in. And then uh couple of the pictures we can scan through.

2:09:35 Next photo. Yeah. Here's when I guess the uh um Rexol was in drugstore was there. And and you can see a a gas lamp. It must have been when the gas lamps were come brought in and the and electrical the electric was all underground. Next slide.

2:10:00 Yeah. Next slide. Thanks. Yeah, that last one was uh it showed when the the skirt was brought down and they lowered the windows and that was in the 60 in the 60s I believe. And I want to mention that the this Oddfellows Hall is is used a lot by the community, you know, for swing dance, music concerts, the the Alistister Frasier fiddle camp and and the St. Patty's uh D Kaye certain film festivals um and all sorts of wedding memorials and rentals and and also for the Odd Advils and but the uh the big um area the big hall is back on Spring Street and this is our our um also access to that area.

2:10:47 So any any questions?

2:10:52 >> Okay. Well, thank you Jim.

2:10:55 >> Anything you'd like to add? Yeah. Oh, sure. My name is Craig Rson. I'm the Noble Grand of the Nevada City Oddfellows Hall. And I originally designed uh this on the 3D printer with the single door and uh it almost got approved. Uh but fortunately, uh and I think it's great. Uh Jessica did an amazing job. uh the the the planning department uh uh all came back with questions and improvements and so we modified this design with the double doors, the automatic opener, the push bar was already in place. Uh and we found out that the lower step was short by a few inches.

2:11:44 Uh and had we left it that way, there would have been a small step down as you exited. Um this way we cut that down so the first step is the correct height with the rest of the steps which is uh more safe in itself. Uh and and everything works. It it really is uh the first time that I can see looking at these old pictures that the Oddfellows will have a true entrance that identifies it from the Broad Street area. Uh people walk by and they have they see Ubiso but they have no idea that the Oddfellow's entrance is there or even what that is.

2:12:31 So I think this will be great because it will identify the hall uh the entrance people won't be confused on where to enter for different events and it will be uh you know first order is safe. So thank you.

2:12:50 >> Great. Thank you. All right. Questions? Any questions? Any I have none.

2:13:02 >> I have I have several

2:13:05 >> none for you. Um

2:13:06 >> Okay.

2:13:07 >> Um so it um a lot of research was done apparently and how to and how to treat modifications to a historic building, although they're proposing making modifications to a non-historic aspect of this historic building. Um, and does that address some people's concern that the contribution of this building uh might be compromised by this addition and and thereby affecting the city's being on the registry of historic places? Has it uh has it been determined that that this treatment if if if treated in in the way that's different differentiated from the historic building and uh removable um that put us on safe ground in terms of um not risking our place on the registry of historic places.

2:14:13 That was a that was a stated concern and so I'm asking

2:14:16 >> yes that question. Um so there are two ways to address that concern. Um and one is a little bit stronger than the other. Um, one is that we have done the analysis and could make findings that we've met the Secretary of the Interior standards 9 and 10 um for the additions to historic properties um and that you know we have we have evidence um that we've attached to the staff report when we make the finding that shows that those standards have been met. um th that analysis was done by the staff planner and you know findings by the planning commission. Um possibly it could be stronger if there were an architectural historian who made that determination.

2:15:08 Um so I'm not trying to hedge but I I think that we have pretty like we have a a pretty solid basis uh for that. I haven't heard anything from the state that would suggest that they're at all considering removing our historic status. Um trying to get a hold of the state architect was almost impossible. They don't they when they finally did respond there they said we are understaffed and we don't look at anything unless somebody appeals a project to us and then we look at it.

2:15:43 >> Okay. And yeah, well, it does seem like like conditions nine and 10 are met. Seems like a good thing to do. Um, uh, and in the normal course of business, the doors will be closed unless somebody needs to open them to get in or out. Essentially, they won't ever be hanging open.

2:16:02 >> Correct.

2:16:02 >> Um, extending beyond the columns. I know it doesn't extend into the into the right of way. Um, but it also for the most part won't aesthetically extend into the rightway.

2:16:17 >> Yeah, there be

2:16:18 >> self-closing.

2:16:19 >> So they they'll be closed.

2:16:21 >> They're very they operate very similar to the national double doors.

2:16:25 >> You you pull one handle and one one door opens up.

2:16:29 >> You press a button, they both open up, but they close. in in your in your computer rendering on the our PDFs uh page 59. Um uh yeah, there's a there's a a mockup of the doors. Are those the doors that you're proposing the the in the photo? Um

2:16:54 >> this one

2:16:54 >> on PDF.

2:16:56 >> What? Now, there I mean there are a couple versions like there's the photo on your model and then there's the photo on

2:17:03 >> Yeah, the I think what he's asking about the ones here.

2:17:07 >> This is the the most recent uh and the most desirable design. Um

2:17:14 >> that was my attempt at Photoshop. It didn't work out well.

2:17:17 >> Okay.

2:17:19 >> So, it worked. I just wondered if it represented the actual doors that you're that you're considering using. No, this this is a door we're considering.

2:17:27 >> Well, yeah, we have um it'll be custom made to our specifications and not off the shelf. So, and we'll the look of this is what we want to reproduce. Okay. Um I have an opinion on that design, but [laughter] You can save that for you can express opinions.

2:17:57 >> And uh and are you let's see are you um completely decided on the two vertical sidelights?

2:18:07 >> Um yeah what the county uh building department said we we want better visibility for when you open the doors to see pedestrians coming up and down the sidewalk. and and they thought that the two sidelights were more effective in actually seeing uh having a better view

2:18:28 >> and to let more light into the uh entryway. There's a there's a light uh in the entryway as as well.

2:18:38 >> And what's what's the what's the width of that wall that extends out perpendicular to the sidewalk? It's probably it's probably in your drawing. It's in there,

2:18:50 >> but

2:18:52 >> it comes out 34 in

2:18:55 >> 34

2:18:56 >> from the wall to to the door the outside to

2:19:00 >> total to the front of the vestibule.

2:19:02 >> Yeah. And that's about that's about oh 3 to 4 in before you do the column. And it suggested that those side lights run as close to the to the ground as possible or

2:19:20 >> um yeah, we could bring them up higher.

2:19:25 >> Well, they're Yeah, they're they exist as is. [laughter] So, yeah, I it's a couple inches. You you met you size it from the top of the door down.

2:19:40 >> Okay. So, you you own the side lightss already?

2:19:43 >> That is correct.

2:19:44 >> Uhhuh.

2:19:48 >> Um, that's all the questions I have.

2:19:51 >> They're they're beautiful, by the way. You're welcome to come see them.

2:19:55 >> Best sidelines ever.

2:19:57 >> Thank you.

2:19:58 >> Expensive sideline.

2:20:00 >> Other questions?

2:20:02 >> Did you say, sorry if I missed this, the doors don't open past the columns? They open past the columns, but they do not impinge on the sidewalk.

2:20:11 >> So, the sidewalk starts where that white piece ends.

2:20:14 >> It's there's a No, there's a

2:20:17 >> line here in pencil. That is the sidewalk.

2:20:20 >> Okay.

2:20:21 >> And this is actually out here is 10 ft of the curve of the roadway.

2:20:28 >> Thank you.

2:20:30 >> Okay, the door open right up to that. I should have drawn it in there, but it's on the on the Okay, other questions. Okay, seeing none, uh, is there anyone in the public who would like to make a comment on this item? Please come forward. I just hear so often whenever I'm around or anything's happening at the Oddfellows how grateful the community is to those that have stepped up to take care of this ancient ancient building. So I just want to express from about 50 people that I know that continually say to these guys that are the trustees at that oddfellow's place how grateful the community is for the amazing work that's been done in the last 10 years.

2:21:21 the improvements and this last improvement makes it possible for people to come from Broad Street safely instead of having to figure out how to get to the to the gallery, how to get, you know, that hidden spot off a spring is different than being on broad. So, harrah, hooray for those that have made this possible.

2:21:46 >> Thank you. Anyone else who'd like to comment? Hi, my name is Lisa Lily and I'm past grand of the lodge and the current treasure. Um, one of the things that we're hoping to do as a lodge is to break make this building more accessible to the public and the community. And by removing the rollup door, which is really cumbersome and actually quite unsightly and quite dirty and putting it beautiful doors, it not only is more inviting, it's environmentally more sensitive because we have to lift those doors open for fire reasons right now. During the winter it's freezing, it's like a chimney of cold air which makes it very difficult for us to heat.

2:22:29 And during the summer it's hot. So being able to have doors that actually close saves energy and it also makes it a much more safer environment where we have relics and things that we want to protect. So when you come up those stairs, I don't know how many of you have been in there, but when you come up, there's front buildings, the windows that look down on Broad Street, those we're hoping to be able to turn into really a museum of the amazing artifacts and stuff that we have that we can open to the public and have dosent that can show people some of the history of Nevada City and the Oddfellows building.

2:23:03 So, that's one of the goals of being able to have these nice doors in there that we can lock, that we can open up, bring people in, also possibly rent some space um up there where we can't do that right now with the metal doors. That's just not accessible for a renter. So, and then one minor correction, it was always my understanding that the first building was built in 1853. This it burned down. The second fire in Nevada City burnt the second building down in 1866. And then this is the current building section the third.

2:23:36 >> Okay. Thank you. Anyone else who'd like to comment?

2:23:43 >> I've been Hi, I'm Deborah and I've been a member for nine years and uh lots of events and many elders actually would love to come and participate in our projects there and they're concerned about the agress and exit safety if they were to be in a big dance party or something like that. and it's been like nine years that we've been talking about this and I'm just so grateful for the good work that everyone's been doing and I hope it goes forward. Thank you.

2:24:09 >> Thank you.

2:24:16 >> Uh hi, my name is Rob Kenstein and I'm a member of the Oddfellows and a trustee with these guys and they've worked incredibly hard on this and I want to thank Jessica for helping us in the city. Um it's been very it's been a very good process I think. Um I'm a I'm a new member of the society and I'm I'm also a builder and went to school in architecture and uh University of California Berkeley. Go Bears. Um and I I've worked on a lot of Victorians in both in San Francisco and my own house here in Nevada County and renovated another house for um Grass Valley Charter School.

2:24:57 And so I just want to bring up that we've really hit a lot of roadblocks um from the historical society and what we I'm sorry to say for unfounded reasons and I I hope in in the future that they'll understand that that we're an organization that is into preserving the building and and really love the building and to put up these roadblocks. I mean, it it's cost us innumerable time and and even money. Um, even though we're all volunteers. So, I'd just like to sort of go on record to say yes, we love the building and we want to preserve it and we're not out here to, you know, destroy the integrity of a national uh recognized structure.

2:25:44 And um even though it's a vestibule, which apparently is not, you know, strictly historic, it does fulfill the requirements of getting us a safe entry. And as Craig pointed out, the bottom step is not to code. It's 5 in, 5 in or something, and the rest are 7 in, 7 and 1/2 in. So I mean, that alone mandates that we take out the concrete and make that step code compliant. So, you know, I I really again compliment the city for helping us and giving us suggestions and an excellent summary that you prepared and um and yeah, and I think the to your question, Tom, about the rich doors, uh I really like the doors that are in the model myself.

2:26:31 Um, I think those look really cool, but I guess as you said, Craig, that they wanted them to deeper glass, the longer glass,

2:26:40 >> the side lights.

2:26:41 >> Oh, the sidelight. Oh, okay.

2:26:42 >> The front door is is shown uh is beautiful.

2:26:48 >> Yeah. So, so it is going to be like on the model.

2:26:51 >> Yeah.

2:26:52 >> And and our our door maker who's generously donating his labor on that on making those doors. I mean, that's that's thousands of dollars. And so I I really salute him. He's And uh yeah. Um what else? I don't want to take up too much of your time, but I I think really in the future um Okay,

2:27:18 >> you can finish your sentence.

2:27:20 >> One of those. [laughter]

2:27:22 >> We can finish your sentence if you'd like. What

2:27:25 >> what I found uh was interesting is the Oddfellows has a manual, a book that talks about all the steps, everything uh about Oddfellows. There's a picture uh in there of doors to one of the lodges and they look really close to these. So I thought, okay, this is good. I'm on the right track. So

2:27:46 >> great. Thank you, Richard.

2:27:48 >> Richard Thomas, 214 Gethsemane Street, Nevada City. I'm a recent member of the of the lodge and and proud and happy to to become a member as I have. Um couple of comments. First of all, uh the fire. I'm very concerned about fire in Nevada City as we all are and have been forever. Uh the two first lodges we mentioned burned. Uh this lodge of course was built with brick and much more substantial um access in times of fire. The back building is most likely to burn. Uh and that lap back entrance on the Spring Street might become unsafe. So the the primary entrance exit in the of course of a fire could be the front.

2:28:25 I also think something should be said about the oddfellows history. The oddfellows asked to be lodge 16 goes back to 1853. It's almost as old as Nevada city itself. The first uh noble grand was Aaron Sergeant. Mr. Sergeant as many folks know went on to become a United States senator. So the Oddfellows have played a prominent role in Nevada City uh throughout its history. uh this brings the Oddfellows into the into the present and I think the folks that have started uh the rejuvenation of the Oddfellows about 10 years ago part of their vision and part of the vision of this new members is to really bring Nevada city uh uh the Oddfellows what we have to offer and this makes us very visible.

2:29:06 It adds to the historical nature. It adds to the interest of uh visitors, tourists. If you go across the street, maybe uh maybe the mineshaft saloon, and you step out and you look at that side of lower broad, you see the National Hotel. Very classy. On the far corner with with Pine Street is the Communal Cafe. I don't know what we call it, the New York Hotel upstairs. And then right in the middle of those is the third large brick building on that side of the street. And that's the Odd Fellows. And right now, you wouldn't know it. You'd have to look way up and see the O up at the top.

2:29:41 So, I think it serves many uh advantages to do this project and uh I appreciate all of your people. Your volunteer time to the community is commendable. Um and I appreciate that. And of course, the research that was done by Mary Morris is remarkable.

2:29:56 >> Great. Thank you, Richard. Anyone else who'd like to comment? Okay. Uh back to the commission for discussion. Tom, I know you said you had an opinion you wanted to express or something.

2:30:14 >> Oh, uh, let's see. Uh well the the variance that's a that's a great that's a great uh solution to the to the consistency compatibility thing and uh generally the project it I mean I think it I think it's a great idea and serves a really important need a a second safe uh form of source of egress and um in the event of a fire and uh the the rollup doors are notably ugly and notably um uh um we have so architecturally though we have like a real a real clash of styles don't we?

2:31:01 I mean the original architecture of the building and then the change that occurred in uh 58 or something and the the sort of board and batten treatment that surrounds the windows that looks 73 to me. I don't know. Um uh and so to to to do something that aesthetically doesn't create another uh disharmonious element um is a concern. The the the arched the arched transom is I think really good. I like I like the illusion to the arches of the window of the windows above or what they used to be. Um, I I I find I find the entry doors to be ornate.

2:31:50 Um, and I don't know what they refer to really. Um, I if we're if we're differentiating from the original design of the of the building. Um uh it does that indeed, but it it kind also conflicts with the the board and batten strange thing below the windows, the uh the storefront windows. Um and I would I would I would lean toward a simpler design without the carvings. whatever whatever height the glazing wants to be um is good, but uh but I think simpler panels and and not a and not a uh an ornate door design that calls a lot of attention to its own ornamentation.

2:32:40 Um so I I don't know if that resonates with other commissioners. Um, and so at some point probably you'll have a better idea of how how the the sides and the front will be joined together at the corners

2:33:03 >> screws I believe.

2:33:04 >> Sure. And and how it's detailed uh matters. It's a really sort of focal thing. It has to, you know, look nice and be not too ad hoc. It's going to it's going to be beautiful. It's people will recognize this as the

2:33:20 >> the question is beautiful how um it's a great project and and so I I think I think more details are uh uh called for and that might be worked out with a liaison. Um, but I I hope the commission u I hope the commission agrees that uh that uh really ornate doors are another maybe unnecessarily uh complex design element.

2:33:55 >> Well, um I think uh Nishan Simmons is going to be our if I pronounce her name right is going to be our liaison. um she was for the last goound. Um and as far as the inor ornateness of the of the doors, I mean that's I mean I I don't have a great opinion on it. My personally I'm I'm not totally sold on this and that only. I do think that some changes might be appropriate for our our arch transom just because the way the visual works it might have to come up a little higher or the arch a little bigger

2:34:33 >> um because we have to look realize there's a vis visible um we're looking up the stairs and now we have the other arch we're going to re re uh recapture once the roll up doors out of there. So, I I could see some room for um some maybe, you know, changes with our liaison's help.

2:34:54 >> So, so it'll it'll evolve as as as as it goes.

2:34:58 >> Yeah. Moving something an inch higher or wider or lower, but uh the asense essential design uh is is this that or how ornate it is is just a matter of of opinion. Uh and if people uh say, "Oh, this looks great." Uh you know, it's the door is going to be manufactured. Uh and we can do whatever we want with the the face of the door. So, it's just a matter of like do we want this or this, you know?

2:35:35 >> Right. We're doing architectural review here. So this is where details like

2:35:39 >> well I personally uh if you go in the temple of our lodge it's ornate. If you look at our regalia it's ornate. Uh so it seems like this is like it presents what is in the lodge you know in my opinion. and and our our cons our our concern is the architecture review committee aspect of the planning commission is how it looks from the outside without regard to what it is on the inside. I think your your signage your that that's uh that's what what matters to uh us and the city and our role with the city is the exterior appearance.

2:36:22 >> Yeah. One thing I comment I there is some ornate the tops of the columns coming up the stairs. Not not the steel columns but

2:36:31 >> which are buried in the in the

2:36:32 >> well those are buried but from the street you can see ornate detail um as you go up the stairway to the top. So there is some that's visible from Broad Street. So

2:36:46 >> but just just to clarify that's buried within

2:36:49 >> No, sorry not buried. I'm going to say it's up the stairs.

2:36:52 >> It's right at It's right at the start

2:36:54 >> the base of the stairs.

2:36:55 >> At the base of the stairs. Okay. So So if you're walk if you're walking down the sidewalk, it's quite

2:36:59 >> There's interior columns that uh are at the base of the stairs

2:37:04 >> uh that were not highlighted because the gate was there. Uh the rollup door is there. So it distracts from that.

2:37:12 >> Seeing the picture refresher above it, too.

2:37:15 >> So those will those will be featured and illuminated. So Okay.

2:37:20 >> They're currently in front,

2:37:22 >> you know.

2:37:23 >> Okay.

2:37:24 >> Any other uh discussion?

2:37:26 >> No, I'm I just I'm just talking about the clashing of styles.

2:37:30 >> Yeah.

2:37:31 >> To that

2:37:32 >> uh actually public's had their

2:37:35 >> I I'll I'll try to I'll try to uh understand what we were talking about future modification of those door storefronts which have that what you know we call it batten. What was the style

2:37:47 >> board and bat

2:37:48 >> board and batten?

2:37:49 >> Yeah. the the little short board and bats.

2:37:51 >> Um it's and I know that's not your responsibility, but it is a reality.

2:37:56 >> Yeah. Um I think potentially there's not a lot of uh woodwork between the skylight this the sidelights and the and the door. There's not a lot of trim and area left to do such you know board and batten work. Think of our new doors as creeping elegance.

2:38:21 >> Okay. Thank you. All right. [gasps] Um, other discussion from the commission. Mishan, do you have any discussion? No. Lindsay?

2:38:32 >> No. Just to um say that I think what Tom's saying about the clashing does stand out to me too with the doors.

2:38:42 >> Oh, and another question. And so your plan is to have them be natural wood or painted.

2:38:48 >> I uh natural stained wood

2:38:53 >> and and just the doors and not the side lights and not the uh the transom mill work.

2:39:02 >> I believe they will match everything else that's there. I think just the like originally our original door we were going to have the natural wood the single door and I think that would be the case here also. Um Gre Gregory Holmes is going to build them and we're looking at solid uh oak.

2:39:20 >> Mhm.

2:39:21 >> But um be a shame to paint that.

2:39:26 >> And you see it all around town. Yeah. Natural for the door only.

2:39:30 >> Right. It's a good spot for it because it is protected from the weather.

2:39:33 >> Yeah. and and the side lights sidelights will all be painted.

2:39:37 >> Okay.

2:39:39 >> Besides the glass.

2:39:41 >> Anything else?

2:39:42 >> Otherwise, I mean, I do see a need for it. Um I think it's a exciting project.

2:39:49 >> Thank you.

2:39:50 >> Um my first reaction on the D. So, first overall general a huge improvement and uh I like the arch and I like the uh the etchings that you've incorporated. I think that really does make a statement about who you are and where you are uh specifically and having uh in the past you know tried to attend places here and walked by it and not known [laughter] uh this is this will be a large improvement. Um my first reaction in in seeing those doors though with the ornateness was not so much that it didn't fit but thinking back to those requirements that it think should be differentiated uh from the original.

2:40:36 I felt that these were more likely to be mistaken for something that was uh closer to the original. I think I think [snorts] doing something uh that is simpler. you know, keeping the overall design uh that you have the arch, you know, everything in uh essentially where it is now, but simplifying that door would make the that fulfillment of that differentiation stronger. Um as well as you know, save that it's generous for your uh woodworker to donate that time, but uh it would save him some time too, I'm sure, to simplify that. Yeah, we you know there's it's it can be whatever you want it to be.

2:41:20 >> Okay, great. Thank you.

2:41:24 >> Those are my comments. Uh so any other final comments?

2:41:27 >> Would you just say like take the design off the bottom of the windows and then maybe make the panels flat or something like completely simplify it or what do you guys have?

2:41:42 >> I'm okay with the design. This is me personally speaking and we can others can chime in here now. I think that sort of scroll work underneath the windows is the is the um the part that jumps out to me most. Uh I would say if that were uh removed and replaced with the simpler panel or the other two panels were extended something along those lines.

2:42:06 >> Uh I'm I'd be interested. I mean Tommy

2:42:09 >> right two two right two two longer raised panels. The raised panels are are are good, great, fine. It would be dumb to have just flat plywoody kind of things. The raised panel looks great. Um,

2:42:23 >> it's just a scroll work. Take that off.

2:42:26 >> The carving is sort of

2:42:28 >> unduly ornate.

2:42:29 >> Not a problem. I I never like the scroll myself, but anyway.

2:42:33 >> Okay then.

2:42:33 >> Thanks panel, [laughter] but I'm not the I'm not the, you know, the boss.

2:42:38 >> Okay. Whatever.

2:42:40 >> It's not a big deal. Okay. At whatever height the glazing needs to be for your for your needs to to to deal with the the crash bar and whatever.

2:42:48 >> Yeah. Okay. Any other discussion?

2:42:54 >> Okay. If not, would someone like to make a motion?

2:42:59 >> Yes. Yeah. I got to go find the uh that correct place again.

2:43:04 >> It's on page 54 or 53.

2:43:21 Lindsay, would you like to make the uh motion then or

2:43:24 >> Okay. Okay. Okay. So, I move to determine the project exemp exempt from SQA and approve the variance. Um, making findings A and B and approve the amended architectural review application. Making findings A through C with the conditions of approval and removing the little scroll on the door

2:43:47 >> and replacing with extended panel.

2:43:49 >> Replacing with extended panel.

2:43:51 >> Great. We have a motion. Do you have a second?

2:43:54 >> A second.

2:43:55 >> I'm sorry. No. Second it. All right. Roll call, please.

2:43:59 >> Commissioner Stemon,

2:44:00 >> yes.

2:44:01 >> Commissioner Knight,

2:44:02 >> yes.

2:44:03 >> Uh, Commissioner French,

2:44:04 >> yes.

2:44:05 >> Uh, Chair Brown,

2:44:06 >> yes. Great.

2:44:09 >> Thank you.

2:44:14 >> Thank you from the best city.

2:44:16 >> All right.

2:44:17 >> Thank you. [snorts]

2:44:18 >> Dance with us. [laughter]

2:44:20 >> And thank you for all the improvements you've made here. It's really come a long way.

2:44:23 >> Well, and thanks. I you know working together with you uh and making these improvements uh really uh had a great development. It's going to be really nice.

2:44:34 >> The research and history are really great.

2:44:36 >> Those are those are fascinating.

2:44:38 >> You know they did a great job.

2:44:40 >> And if you want a really detailed uh slide presentation that's twice as long with history, we have it.

2:44:47 >> Thank you so much. If you look at the old building,

2:44:58 I need some money so we can restore the actual. [laughter]

2:45:01 >> Okay. Thank you.

2:45:03 >> Yeah.

2:45:03 >> All right. Well, we have we have more items on the agenda. So, [laughter]

2:45:08 >> thank you. Thank you.

2:45:14 >> All right. Amy's coming back. It's going [laughter] to be close.

2:45:21 >> The next item is 545 and 555 Surles Avenue tentative parcel map application.

2:45:30 >> All right, Jessica.

2:45:31 >> Thank you.

2:45:35 >> Okay. Oh, my glasses here. All right. So this project is a tenative parcel map application for a site on Sills Avenue that's currently developed with two metal buildings and associated parking and utilities. All of this construction was done with an approved site plan from the planning commission.

2:45:57 >> [clears throat]

2:45:57 >> Um, one of the buildings uh at 545 Surls is vacant right now and at 55 sorry that was at 545 and at 555 there's one commercial cannabis tenant that occupies a portion of the building. This property is uh fully developed and zoned light industrial with the scenic corridor overlay on it. The um the parcel currently is 2.29 29 acres and the proposal is to to divide it into two parcels of 1.08 and 1.21 acres. Um the parcels would share an existing paved common access road which comes off of Sorl Avenue. Um and it is a a fairly level site. Um so I think the best thing to do is probably to show this aerial view um of the map.

2:46:49 And this does not replace the actual tenative map. This is just an aerial view with um a roughly drawn line of where the parcel line would be divided um or the parcel would be divided with this proposal. So you can see that um this parcel 545 has contains the common access drive and parking and um 555 contains its own parking lot and would share common access uh from this. There are some other structures out here or uh uses out here. This property also takes access from this shared drive as well. And this is the tenative map. If we need to look at anything more carefully, I can zoom in on this.

2:47:36 Um, but I I I won't do that right now. I don't think this project is is pretty simple, actually. So, you know, normally with a land division, we would look pretty carefully at the physical impacts of what could happen in the future with the division of the site, but since this is already developed, it is categorically exempt from SQUA. and doesn't require any additional review. Um it it doesn't result either in the potential for additional development that it already doesn't have. Um the probably the most important thing with this particular map is just making sure that everybody who currently has access on the drive and for utility access continues to retain that access.

2:48:23 And so um there are conditions of approval provided by the project engineer or the city engineer rather for that purpose. Um that requires a reciprocal access easement uh for shared use and maintenance of the private roadway and any shared facilities. And the project is consistent with the employment center general plan designation um which does not have minimum parcel sizes. So we don't have to be worried about how large these lots are. There's no minimum parcel sizes with the light industrial zone either. So staff is recommending that the commission find the project exempt from squa and approve the tenative parcel map subject to the conditions of approval shown in the staff report.

2:49:06 That concludes my presentation.

2:49:07 >> Thank you. Anything you'd like to add to what Jessica said? I would just like to clarify for uh the commission's behalf that uh the ex or the the building existing building at 569 Sirills Avenue and the building at 535 Sirills Avenue as well as the two buildings at 545 and 555 have the right to use the 30foot ride trip. Uh that is the current access road per the parcel map that created these three parcels. Um that is parcel map recorded in book I think it's 17 at page 41.

2:50:00 Um I agree with the city engineers condition that we will have to do a reciprocal easement for the two proposed parcels. But the other parcels already have the legal right to drive in and drive out of that access roadway. That's also a public utility easement. [snorts]

2:50:21 >> Okay, great. Thank you. Are questions from the commission?

2:50:28 >> Nope.

2:50:29 >> Yes. [laughter] Shocking. the uh the line between parcel one and parcel two on my map, the top one, the bottom one. Um that that's that's a parking area.

2:50:42 >> It's actually a driveth through area.

2:50:45 >> Yeah. Um uh so is that part of what you're going to work out with the city engineer if

2:50:52 >> Oh, that there. Yes, there will be a reciprocal access.

2:50:56 >> So, you know, crossline access. is very common for a situation like this where we split a parking lot. We have common access and parking agreements based on the two buildings.

2:51:09 >> Okay. So, there's a low likelihood that anybody that there's going to be turf wars.

2:51:13 >> There will be no likelihood of that when the map is recorded.

2:51:16 >> Okay. Well, that's the entirety of my questions.

2:51:20 >> Thank you. Yeah.

2:51:21 >> All right. Any other questions?

2:51:24 >> No. And there's no public here to make a comment. So, any discussion on this item? Seeing no discussion, would someone like to make a motion?

2:51:36 >> I'll motion to approve.

2:51:37 >> All right,

2:51:38 >> I'll second.

2:51:39 >> I think Can you read a few more details in your motion? [laughter]

2:51:43 >> Motion. I'll motion to make a finding. The project is exempt from SQA uh in to approve the tenant parcel map subject to the conditions uh listed A through K and um of the planning department A B and everything underneath them

2:52:07 >> and the engineering department

2:52:08 >> and the engineering department. Thank you.

2:52:11 >> Okay. Thank you.

2:52:14 >> I'll second.

2:52:15 >> All right. Roll call, please.

2:52:16 >> Commissioner Simmons,

2:52:17 >> yes.

2:52:18 >> Uh, Commissioner Nye,

2:52:19 >> yes.

2:52:20 >> Commissioner French,

2:52:21 >> yes.

2:52:21 >> Vice Chair Compton,

2:52:22 >> yes.

2:52:23 >> And Cher Brown,

2:52:24 >> yes.

2:52:26 >> All right. Thank you for your time.

2:52:28 >> Thank you for your time.

2:52:29 >> Questions. [laughter]

2:52:31 >> I wish I would have been first.

2:52:33 >> Sorry.

2:52:36 >> Okay. Uh, going on to our last hearing of the day, model water efficiency landscape ordinance. All right,

2:52:46 >> this will be a couple hours. [laughter]

2:52:51 >> Only if you have questions.

2:52:52 >> I Commissioner Simmons has let me know that she does need to leave at about 10 till something like that.

2:52:59 >> Okay, so keep

2:53:01 >> Okay, I'll try to keep it short here. Um so [cough and clears throat] currently the city um regulates landscaping in our municipal code in sections 178050 through 070. Um these sections of the municipal code are are fairly short um just a couple of paragraphs that establish requirements for landscaping within setbacks, disturbed areas, parking lots, street frontages and other areas of development. Um and they also address planting quantities, tree and shrub requirements and those types of things. Um but it they are very stripped down landscaping requirements and um the the city has essentially kind of skated by for it looks like for quite a while with this landscape ordinance.

2:53:51 Um, in speaking with some landscape architects around town, I have learned that most other places have actually adopted um, what most people call a WOO ordinance um, quite a long time ago. Um, because these requirements um, under the state for a water efficient landscape ordinance came into effect in 1993. Um but what has been happening since that time is there's been updated versions of the wheelow through the state and then with that just recently more compliance more sort of enforcement uh from the state. So the city just received a an email from the state indicating we were out of compliance and we needed to come into compliance within 90 days and that was you know 45 days ago or so at this point.

2:54:40 So, we're working on trying to get this done as soon as possible and very quickly. Um, we can ask for an extension. Um, but I'm not sure what that would look like exactly. So, you know, there are potential civil penalties if we don't come into compliance or we're not showing progress towards it.

2:55:00 >> Um, [clears throat] so the um there is a somewhat long proposed ordinance in your staff packet. uh we would add uh many new definitions. First, I'm just try to run through this real quickly. We would repeal the existing landscaping provisions just to make sure we're not um inconsistent across um across the different sections and it does make it harder for staff when there are multiple sections in different parts of the code pertaining to the same topic. Um so um some of the changes that you will see in the packet is um previously we did not have a requirement to landscape disturbed areas that weren't being used.

2:55:48 So that's been added. Um and that is that's part of the you know um the reason for that is is to make sure that we have erosion control over sites that have been disturbed. and it doesn't doesn't necessarily add a lot to cost. You can do that with uh seed mixes and things like that or mulch. Um parking lot perimeter landscaping. Um I think we've run across this on a fairly recent project where we didn't know where it was supposed to start. So that's been clarified in the proposed ordinance that it does need to be outside of the public right of way. um just w with an option that if somebody really wants to landscape the right of way, they can if the city engineer says it's okay.

2:56:31 Um but if we allow that as part of the required landscaping and then we need to actually use our right of way for sidewalks or road improvements, then we've lost the landscaping on that site. So that was a reason for that change. Um we had very very high numbers of required plants. Uh we ran across that recently with the same um industrial project. um and those numbers um don't really work out realistically. So there are some new planting requirements that are more commensurate with other jurisdictions in our area. Um and so just for reference I did look at the city of Grass Valley, town of Truckucky and Nevada County and then some other um smaller cities as well in um preparing these.

2:57:19 Okay, what else? So there's a new chapter. The essent the purpose of this with the state is really to promote efficient water use. So that means that plantings need to be um hydrozoneed. So they you know every things that need more water happen in the same area of the landscape plan and things that need less water in other areas. Um irrigation is very important like how what that actually looks like. There are requirements if it's a very large landscaped area that it occur under the mulch and under the soil that the lines instead of being above because those can break more easily. Um using more low water use native and drought adapted plants is important.

2:58:03 There are requirements for how thick the mulch needs to be on the site and things like that. So, what the proposed ordinance does, and this is in conformance with state law, is if someone comes in and their required landscaping is under 500 square ft, their requirements are pretty simple. Um, if they're between 500 and 2500 square ft, they can use an alternative prescriptive compliance pathway or they can opt to do what are called performance requirements, which are a lot harder to do. So they pro, my guess is somebody if they had the choice would choose the prescriptive compliance pathway because it basically is a checklist that they can go through and say, "Okay, I've met all of these things."

2:58:48 If they're over 2500 square feet of landscaping, then basically the state's performance-based compliance requirements kick in and you they have to have a landscape architect prepare irrigation plans and um and the whole and the landscape plan and what that looks like. Um, since I've been here as your city planner, I haven't really seen anything that requires that much landscaping. Um, but I I have worked on a lot of other projects where there's a lot of landscaping and um, I think this will save a lot of water in the city if we do start developing more. Um, so I think this is this is a a good change in the right direction.

2:59:33 Um, it does add to some of the requirements that people currently have, but we we just don't have a lot of projects that require a lot of landscaping as far as I've seen in the last year or so that I've been here. So, um, I just don't think it'll affect that many people, at least at this point in time. And then the new projects we get will be landscaped um, using less water. So, um, I'll try to shorten this up here. [laughter] Trying to be thorough. Um let's see. We are consistent with the general plan. Um there are some local considerations that um I took into account when drafting this ordinance.

3:00:16 Um retaining existing mature vegetation and native vegetation is important. Um, in the historic district, there are some exemptions if if somebody is in the historical district that they don't have to do interior parking lot landscaping, for example, or other parking landscaping um because there's just this of the space constraints. Um, there are also um the the uh city's I'm going to forget his title. It's very long. Evan McClennon's title is I think community wildfire prevention and preparedness safety officer or something like that. [laughter] It's a lot of words. Um he reviewed the ordinance to make sure that we're consistent with defensible space requirements.

3:01:03 um that could be kind of tricky like if once we actually do look at larger landscaping projects um in in my conversations with some landscape architects, it's something that I know the city of Grass Valley is working on right now and and it's confusing. Um it can be very confusing. So, um that's okay though. [laughter] Uh we'll work through our projects as they come. So, this project because it's a state mandate, it isn't it is exempt from squa. Feel like there's something else I wanted to touch on here, but I'll wait for your questions. Um, so staff is recommending that the planning commission find the project exempt from squa and um this sorry and I want to point out there is a sentence up here that's important.

3:01:52 you're recommending to the city council um that you that to adopt the ordinance and to find the project exempt from SQA. You're not actually doing this actions. You're recommending to the city council. And that concludes my presentation.

3:02:07 >> Thank you.

3:02:07 >> Thank you.

3:02:08 >> Well done. Okay.

3:02:09 >> Thanks. [laughter]

3:02:11 >> I'll I'll start with a question. Is are you anticipating any further guidance from the state regarding that last thing you just mentioned the you know wild fl wild

3:02:22 >> fire not wild flowers

3:02:23 >> especially zero zone

3:02:25 >> wild flowers would be nice wild fire uh and defensible space and the and just what we're talking today

3:02:33 >> um I'm not at the moment I don't know that they're coming out with any guidance on that um but I will follow up with grass Grass Valley and see how they're coming along with theirs.

3:02:45 >> Um, this doesn't the state mandate doesn't really have any impact on how much landscaping we require.

3:02:53 >> Um, but I did update some of the landscape requirements because it was I wanted it to be in one chapter to make it easier to administer. Um, so if we wanted to look at updates to how much landscaping is required and where it's required and kind of clarify that nothing is allowed in that zero or what the five foot um clearance zone around structures zone zero. Thank you. Yes.

3:03:18 >> Yeah. Um but try we tried to incorporate with Evans help he put some language in there about that. Um, and then I think, you know, as each project comes in, when we do get them, we'll just have to work through them individually. Um, and then there was another point too I wanted to make, which is that we are doing some more comprehensive zoning text updates with the housing element update and that those will include some updates to our parking standards. And so, the amount of landscaping that's required in a parking lot depends on how many spaces there are. So, if we are making updates to how many spaces are required at some point in the future, we could also get into back into this ordinance and make modifications at that time.

3:04:07 Um, I'm thinking as we do the zoning the comprehensive zoning text updates, potentially I could take certain sections back to the commission just forformational purposes to get some guidance from you on what you'd like to see. And then at least this keeps us out of the $10,000 a day fine,

3:04:28 >> right? Yes.

3:04:29 >> Um I have a just curiosity. [cough and clears throat] You keep saying mulch. Um when I did my landscaping, Sam came out and said because we started to put mulch down and he said, "No, no, you can't do that." So we put gravel. Um

3:04:42 >> so is But maybe the zone thing.

3:04:44 >> I think it's you can't put mulch next to your house.

3:04:47 >> Yeah. He said the whole yard.

3:04:49 >> That doesn't sound right.

3:04:50 >> Doesn't sound like Sam either, right? I I don't know who Sam is.

3:04:55 >> Sam Goodsby, the former fire chief.

3:04:58 >> Yeah,

3:04:59 >> a lot of the required landscaping that this would apply to would be in commercial and industrial developments.

3:05:05 >> I was wondering that too.

3:05:06 >> Yeah. So, it would be more like in parking lots.

3:05:09 >> Yeah. The mulch would be okay.

3:05:11 >> Yeah. Not not close to the structure. So, and that's where I think, you know, if there is landscaping up against a new commercial building or something, that's where Evan would come in and say, "Uh-uh, not right there. You're not doing um uh wood bark or whatever. You you're doing stone mulch."

3:05:29 >> Yeah. And I know there's been, even though it's not necessarily specified, I know there's concerns about mulch catching on fire and being blown, you know, so you're basically creating an ember source,

3:05:40 >> but I don't think

3:05:41 >> Well, we're not because we have problem.

3:05:42 >> Well, yeah. [laughter] Yeah. Yeah. So

3:05:46 >> that was So that's my question. My two questions is are um to clarify is this for residential properties or is this industrial and like larger scale projects?

3:06:04 >> Yes. And the second

3:06:06 >> Okay, great.

3:06:06 >> Not residential because we don't require landscaping on residential properties.

3:06:09 >> Then my second question was who's going to enforce this? Uh, and what does enforcement look like? So, for example, on the um railroad a property, right?

3:06:21 >> Yeah.

3:06:22 >> Um,

3:06:24 >> what does enforcement look like for that? Like what if they what if they don't do

3:06:29 >> what they're supposed to?

3:06:32 >> Is this placing and I guess this is kind of irrelevant like I understand that we need to pass it but or recommend it

3:06:38 >> for so this the city can do auditing if it wants to say if there were there was a lot of landscaping and we thought I don't know we have a big amusement park that comes in on the outskirts of town or something [laughter] it's called Yes, thank you. [laughter]

3:07:00 >> Amusement in quotations. Um then we could um the commission could say that this project needs to be audited every year and then that information gets reported to the state. So from every year I actually do have to report to the state on what we've done with wheelow and we haven't done anything with it yet. So I haven't been reporting much of anything. Um but but yeah, we could include audits as part of our annual report to the state.

3:07:30 >> I'm I guess I'm just so curious. It seems like it's creating an extra level of work

3:07:36 >> with the right intention. I I wonder what it does to your workload.

3:07:40 >> Yeah. Okay. [laughter] Great answer. Me too.

3:07:46 >> That's all state mandates do.

3:07:49 >> But [laughter] correct me if I'm wrong. Seems like the the enforcement of this is same as anything else in our code.

3:07:55 >> Yeah.

3:07:55 >> Through conditions of approval. They have to maintain their landscaping.

3:07:59 >> If it's a new commercial or industrial site, then that would be one of the conditions on the site plan.

3:08:04 >> Okay.

3:08:05 >> Yep.

3:08:06 >> I I thought I saw a line someplace. I I had the same question. Who verifies compliance? Yeah. But at at the end of their uh uh project, uh I thought I saw a line that has to do with an in a city inspector going and checking that they complied.

3:08:22 >> That's right. After it's all installed, we definitely go out and do a final inspection.

3:08:26 >> Right. And the only thing that we've done is comfort plumbing essentially that this pertains to.

3:08:31 >> Yeah.

3:08:31 >> Yeah. Yeah.

3:08:34 >> Any other questions? Anything, Lindsay? No.

3:08:36 >> No. Um, no, no public comment. So, any discussion? I'll I will chime in. I I did ask some questions of Jessica, you know, um about uh the parking because I had some general questions about, you know, the necessity of these very suburban, you know, tree wells or, you know, uh islands within larger parking lots. But I I think deferring that to the larger parking review is the appropriate thing. So, And then one one general question is is the state's main interest in water savings is that kind of what what is driving this?

3:09:15 >> Yeah. Drought.

3:09:17 >> Yes.

3:09:17 >> Okay.

3:09:20 >> Okay. Any other discussion questions, your honor?

3:09:24 >> All right. Uh would someone like to make a motion? too. Um, I'll make a motion uh recommending that the city council determine the pro um proposed ordinance is not subject to squa and to adopt ordinance number 206-xx to be determined. Huh? Yep. We sending Do I have to read that whole thing?

3:09:52 >> I don't think so.

3:09:53 >> Okay. as as as presented in

3:09:57 >> as presented staff report.

3:09:59 >> I think you clerk is saying you do need to read the whole thing because it's the title.

3:10:02 >> Is that what you're saying?

3:10:03 >> No.

3:10:04 >> Oh, I thought you did. Okay.

3:10:05 >> I'm sorry.

3:10:06 >> Thank you. [laughter]

3:10:07 >> I will I will second the motion. Roll call, please.

3:10:10 >> Uh, Commissioner Simmon,

3:10:12 >> yes.

3:10:12 >> Commissioner Knight,

3:10:13 >> yes.

3:10:14 >> Commissioner French,

3:10:15 >> yes.

3:10:15 >> Vice Chair Cobden,

3:10:17 >> yes.

3:10:17 >> Uh, Chair Brown,

3:10:18 >> yes. Great. All right.

3:10:22 >> All right. Any final announcements? I think you had a few things in there, Jessica.

3:10:26 >> Oh, yes. Let's see. Um, okay. So, we just had our second community workshop for the housing element, and that went really well. Um, we have all of the data from the first workshop and the first survey, too. If anybody wants that, let me know. Um, it was presented at the second workshop. Um, but I'm happy to forward that on to you if you'd like to see it. Um, and we're still I'm still trying to find time to draft up a new lighting ordinance. Um, and then at some point I would also like to bring the signage ordinance back to you guys. Um, because city council has been talking a lot about A-frames and window decals are kind of up and around everywhere and I don't know how to give people guidance on decals because our ordinance doesn't speak to them at all.

3:11:18 But I have a lot of good ideas about how to deal with them. So, [laughter] um, I'd like to to bring that to the planning commission at some point as well.

3:11:28 >> Would that apply [clears throat] to window etchings as well?

3:11:31 >> Sure. Yes.

3:11:32 >> Anything basically on windows? Probably. Yeah.

3:11:35 >> I can make sure that gets

3:11:37 >> like Oddfellow's

3:11:39 >> like Oddfellows like painted signs on windows. Yes.

3:11:43 >> Yes.

3:11:45 >> Yeah. And posters and windows. That's a thing that has happened a few times. So, thanks.

3:11:52 >> Okay. Anything else?

3:11:54 >> Yeah.

3:11:55 >> No, that's it. Sorry.

3:11:56 >> All right. With that then we are adjourned.

This meeting as data · The transcript as data.